Laserfiche WebLink
RECLAMATION COST SUMMARY cont~d <br />H. EARTHNORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description <br />sheet 3 of 4 <br />Cost (E) <br />________I__________________________________________________I____________ <br />~~ Subtotal (H ): <br />____________ <br />I. EARTHNORK - DRAINAGE CONTROL SYSTEM iNSTALLATI ON/REMOVAL <br />Task No.~ Task Description ~ Cost (E) <br />________I__________________________________________________I____________ <br />J. EARTHYORK - TOPSOILISU85OIL REPLACEMENT <br />Task No.~ Task Description <br />________I_____________________________________, <br />6 ~ Spread topsoil and overburden to 10" <br />depth - north site. <br />11 ~ Spread stockpiled soil - south site. <br />Subtotal (I): <br />Cost (f) <br />510,863 <br />513,548 <br />Subtotal (J): 524,411 <br />