My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC20187
DRMS
>
Back File Migration
>
Inspection
>
INSPEC20187
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:21:03 PM
Creation date
11/18/2007 9:33:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Inspection
Doc Name
OSM Inspection Report
From
OSM
To
DMG
Inspection Date
2/10/2005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U. S. DEPT. OF THE INTERIOR <br />r OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ Permit Field Visit <br />Person COORS ENERGY CO. Number C-028-81 Date 02/10/2005 Continuation Page <br />28. Performance Standard Categories <br />Codes: 1=Compliance, 2=Noncompliance, 3=Not Planned, 4=Not Started, S=Noncompliance Identified Elsewhere, 6=Previously Cited <br />A. Administrative <br />1. 1 Mining within Valid Permit <br />2. 1 Mining within Bonded Area <br />3. 1 Terms & Conditions of Permit <br />4. 1 Liability Insurance <br />5. 1 Ownership and Control <br />6. ~ Temporary Cessation <br />7. 1 AML Rec. Fees -- Non-Respondent <br />8. 1 AML Rec. Fees -- Failure to Pay <br />B. Hy drologic Balance <br />1. 1 Drainage Control , <br />2. 1 Inspections & Certifications <br />3. 1 Siltation Structures <br />4. 1 Discharge Structures <br />5. 1 Diversions <br />6. 1 Effluent Limits <br />7. 1 Ground Water Monitoring <br />8. 1 Surface Water Monitoring <br />9. 3 Drainage -- Acid-Toxic Materials <br />10. 1 Impoundments <br />I1. 3 Stream Buffer Zones <br />C. To psoil & Subsoil <br />1. 1 Removal <br />2. 1 Substitute Materials <br />3. 1 Storage and Protection <br />D. Backtilling & Grading <br /> 1 . 1 Exposed Openings <br /> 2. 1 Contemporaneous Reclamation <br /> 3 . 1 Approximate Original Contour <br /> 4. 1 Highwall Elimination <br /> 5. 1 Steep Slopes (includes downslope) <br /> 6. 3 Handling of Acid & Toxic Materials <br /> '7. 1 Stabilization (rills and gullies) <br />E. Excess Spoil Disposal <br /> 1. 3 Placement <br /> 2. 3 Drainage Control <br /> 3. 3 Surface Stabilization <br /> 4. 3 Inspections & Certifications <br />F. Coal Mine Waste <br /> (Refuse Piles/Impoundments) <br /> 1. 3 Drainage Control <br /> 2. 3 Surface Stabilization <br /> 3. 3 Placement Ge <br /> 4. 3 Inspections and Certifications Perf <br /> 5. 3 Impounding Structures Cat <br />G. U se Of Explosives <br /> 1. 1 Blaster Certification - <br /> 2. 1 Distance Prohibitions <br /> 3. 1 Blast Survey/Schedule - <br /> 4. 1 Warnings & Records <br /> 5. I Control of Adverse Effects - <br />H. 3 Subsidence Control Plan <br />I. Roads <br />1. 1 Road Construction <br />2. 1 Certification <br />3. 1 Drainage <br />4. 1 Surfacing and Maintenance <br />5. 1 Reclamation <br />J• Signs & Markers <br />1. 1 Signs <br />2. 1 Markers <br />K. 1 Distance Prohibitions <br />L. Revegetation <br />L 1 Vegetative Cover <br />2. 1 Timing <br />M. 1 Postmining Land Use <br />N. Other <br />neral <br />ormance <br />agory <br /> Performance Standard Catagories E. Excess Spoil Disposal ...................................... .....(816/817.71-74) <br /> 30 CF+R COnnterpart 1. Placement........................................................._...... ...... _..................7](e) <br />A. Administrative ................................. ........................................ 2. Drainage Control...................................................._ ._.........,........_...71(f) <br />I . Valid Permit....._..._........__........_.._........_._ ..._ .............................773.11 3. Surface Stabthzatioa........._......._._........................ _.........................71(g) <br />2 . Mining within Bonded Area ................. ..............................:773.11 4. Inspections &Certifications...................................... .........................71(h) <br />3 . Teens & Conditions of Permit. _._ ........ ...............................773.17 F. Coal Mine Waste (Refuse Ples/Impoundmcnts) ,•,,,(816/817.81-84) <br />4 . Liability Insurance ................................. ...............................800.60 <br />5 . Ownership and Contro] .......................... .............................778.13 1. Drainage Control ..................................................... ..........................53(a) <br />6 . Temporary Cessation ............................. .842.11(e)&8]6/817.]31 2. SurfaceStabilization................................................. .........................83(b) <br />7 . AML Rec.Fees--Non-RespondanC ...... .........._......,......870.15(b) 3. Placement.................................................................. .........................83(c) <br />8 . AML Rec. Fees -- Failure to Pay ........... ...................._....870.li(a) 4. Inspections and Certifications................................... ........................83(d) <br /> <br />B. <br />Hydrologic Balance .......................... <br />............(816/817.41-57) 5. Impounding Structures .............................................. .............................84 <br /> G. Use of Explosives ............................................. .....(816/817.61-68) <br />1 . Drainage Control ..............................._... .............._...................,.45 <br />2 . Inspections&Certifications .................. ................_.,.......49(a)(10) 1. BlasterCertification.................................................. ...._...................61(c) <br />3 . Siltation Structures ................................ ......_._...........................46 2. Distance Prohibitions..................._...........;............... _.......................61(d) <br />4 . Discharge Structures ............................. ...........__................._....q7, ~. Blast Survey/Schedule.........._..........................._...... _......................62-64 <br />5 . Diversions .............................................. .....................................43 4. Warnings & Records ................................................. .....................66 & 68 <br />6 . EffluentLimits ..........................._.......... .....................................42 ~. Control of Adverse Effects......_....._............._.......... .............................67 <br />7 . Ground Water Monitoring ..................... .................................41(c) H. Subsidence Control Plan................................. ........(817.121-122) <br />8 . Surface Water Monitorino._ .................. ......._..........,.............41(e) I. Roads............... ....... <br />.......................................... .(816/817.150-151) <br />9 . Drainage--Acid-Toxic Materials..._ ..... ......................._........41(f) <br />]0 . Impoundments ...................._......_......... ........._...._...................A9 1. Road Construction.................._.._..._........................ .... _................li0(c) <br />]1 . Stream Buffer Zones_ ............................ ...................._...............57 2. Certification..........................................._.................. .......................lil(a) <br /> 3. Drainage ..............................._................._............_... ......._.li0(b)-1~1(d) <br />C. Topsoil &Subsoil .............................. .................(816/817?2) 4. Surfacing and Maintenance.................._.._................ ......._.li0(e)-lil(d) <br />1. Removal.........._ ..................._........_..._. _............................._22(a) 5. Reclamation............................................_................. ._....................150(fl <br /> J igns&Markers............................................. .......... <br />6/ <br />8 <br />1 <br />) <br />4. Redistbud'rotedtion........._~........._ ...... ......................._......_2~(d) 1. S ' <br />a <br />(b)& <br />c <br /> 2. Markers 11(a) (b),(d),(e),&(f)' <br />D. Backfillin & Gradin <br />g g .................... ..........(816/817.95-107) K. Distance Prohibtttons......... <br />......... . <br />............... <br />..(761.11) <br />1. Exposed Openings .....................816/817. 13, 14, li, & 823.11.& 21 L. Revegetation............................ <br />•~•••••••••••••~•••••••• ( ) <br />• 816/817.111-116 <br />2. Contemporaneous Reclama[ion ............... ...................................100 <br />3. Approximate Original Contour ................ .... ...._........_......102(a)(1) 1. Vegetative Cover......._.......__............._.... _............._ ............lll & 116 <br />4. HighwallElimination.._....._ .................... ........................_I02(a)(2) 2. Timing._..............._....................... _...._.................... ...........................113 <br />5. Steep Slopes (includes downslope) .......... ........................._.......107 nq, Postmining Land Use...................................... ........(816/817.133) <br />6. Handling of Acid & Toxic Materials........ _....._ ................._..102(c) <br />7. Stabilization (rills and gullies)_..._ .......... ................._......_._...95(b) ar,,;,~a oo~omx,u, tsea Page 2 of J <br />
The URL can be used to link to this page
Your browser does not support the video tag.