My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC20187
DRMS
>
Back File Migration
>
Inspection
>
INSPEC20187
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:21:03 PM
Creation date
11/18/2007 9:33:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Inspection
Doc Name
OSM Inspection Report
From
OSM
To
DMG
Inspection Date
2/10/2005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MIl~~~~.~y <br />Mine Site Evaluation <br />State Program <br />MAR 0 2 2005 <br />1. Permittee/Person 9. Permit Number pirisian of Minerals andl'~.a ~tYmit Type <br /> COORS ENERGY CO. C-028-81 PP <br /> 2. Address I1. Field Visit Date 12. Purpose 13. SRA Present <br /> P. O. BOX 467 02/10/2005 ~ ^Y <br />3. City 4. State mm-dd -yyyy <br /> <br />CO <br />ld <br />G 14. Permit Status 15. Site Status 16. Facility Type <br />o <br />en A^ MC <br />5. Zip Code 6. Phone Number <br /> 17. OSM Office # I8. CCID # 19. Land Code <br />80402 (303) 277-6042 <br />7. O erator Name, if Different than Permittee 140 <br /> 20. M.5.H.A ID # 21. State Abrev. 22. County Name <br /> D <br />W <br />e <br />8 <br />Mi <br />N OS-03515 EL <br />CO <br />. <br />ne <br />am <br /> 23. AVS Permittee Entity ID Number 24. State Office <br />KEENESBURG STRIP <br /> 056858 <br />25. Hours 26. Si r atm•e Block 27. 'Reviewing Official: <br /> <br />2-0 a. Permit Review 'r <br />~f ~~~ <br /> <br /> Si at e. ~--~ i S/O ~ Signature: <br /> q <br />0 b. Site Visit Time <br /> , HENRY STIN ID # 116 <br /> _ <br />2,0 c. Travel Time <br />Printed Name: Review Date: Z / (5 ( Z~c') <br /> mm - dd - yyyy <br />2,p d. Report Writing Date: 02/15/2005 Is Supplemental MSE Page Used YIN Y^ <br />Permit Type -Item 10 .IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR....Citizen Complaint Referral (non site visit) <br />O~„.,Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />axx.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection -Item 13 Ajoint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status- Item 14 AB....Abandoned: All surface and underground coal mining activities have ceased antl <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(8) <br />ppermitted but not yet disturbed. AB1.. Bond Forteiture: Bond forfeiture offcially in process or completed, and. <br />IN....Inadive (Permanent Program Permit): Phase II completed or reclama0on in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) AB2..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated, used to reclaim site, but site not reclaimed to Program standards. <br />BR... Bond Release: Reclamation completed and State Regulatory A83.. Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (R4) has released all of the bond (Phase III Release.) NA...Not Applicable: When site is unpermitted. <br />Site Status Codes -Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND.. No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending: The RA Is pursuing <br />operations have been started. site regraded and awaiting phose bond release. actions to revoke the permit, collect the <br />loration: Coal ex <br />loration o <br />Coal Ex <br />erations TC <br />form <br />e b <br />EX <br />T <br />d <br />C <br />ti <br />Th <br />RA h <br />t <br />d/ <br />l <br />p <br />p <br />p <br />.. <br />.. <br />emporary <br />essa <br />ed per <br />anc <br />on <br />(s), an <br />or rec <br />on: <br />e <br />as gqran <br />ama- <br />have started and where coal mining operations cessation of mining pursuant to 30 GFR 816/ lion of torteited site is in progress. <br />have not begun. 817.131(6). ~ FR_ Forfeited and Reclaimed: Forfeiture <br />AP.. Active Coal Producing: Coal surface mining P1...Phase I Release: At least Phase I bond release reclamation completed. <br />activities are occurring. granted for entire permitted area. For interim FO.. Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permds, partial bond release. 5 permitted but there is no bond. <br />facility such as tipple or preparation plant. P2.. Phase II Release: At least Phase II bond release WC. Wildcat: Coal mining and reclamation <br />P <br />it S <br />i <br />i <br />ng: The <br />erm <br />tatus <br />s active, site is for the entire permitted area. operations have or are taking place and <br />NM..No Min <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the activity is not covered by the <br />mining activity, and site not regraded. the RA has released all bond, required permits from the RA. <br />Facility Type Coles -Item 16 D...Ancillary (Haulroad, Conveyor, and/or Rails) H._Exploration Permits L.. Remining site permitted <br />A... Surface E... Refuse and/or Impoundment I._. Notice of Intent to Explore under 30 CFR785.25 <br />B._ Underground F... Loadingg Facility and/or Tipple J... Exempt 16 and 2/3 <br />C... Preparation Plant G...Stockpiles K... Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments fro <br />small businesses about Federal aoency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each aeencv's <br />responsiveness to small business/ If you are a small business (a business with 500 or fewer employees including those of affiliates) page 1 of <br />and wish to comment on the enforcement or compliance activities of OSM, call 1-888-REG-FAIR (1-88R-934-3247). a<~,.<a n«<mncr s, is9a <br />
The URL can be used to link to this page
Your browser does not support the video tag.