Laserfiche WebLink
Development Waste <br />Much of the sediment cleaned from pond 8 was deposited on the Development Waste Pile. <br />The operator has spread this material since the last inspection to speed the drying process <br />before compaction. Ditch D2 was noted in the last inspection report as in need of cleaning <br />and re-shaping. This work has been completed as shown ion the following photograph. <br /> <br /> <br />„-ems . <br />. . ,~ <br /> <br /> <br /> <br />M~..• <br />- <br />/ r <br />a-, + .' . <br />u a <br /> <br />~'i <br />~~ <br /> w+ ~ <br /> • <br /> <br />~, _ <br />~ <br />~ <br />~ <br />~~ <br />. •• <br />~ <br />~ <br />} r.. .. <br />~ K11 <br />. .~ <br />t~ <br />~ . <br />~ ~~.. t <br />. <br />•t <br />•'~. _ <br />._. ~ <br />.. z <br />n _ry <br />_ <br />-. <br />• <br />~ <br />r ~' <br />•._ ~ - <br />i-P ri ..-. <br />'- ~ .... ..+.~.. - <br />. <br />to "~ _ <br /> <br />Holy and re-shat~irg Apnl 2066 <br />Overall, the site appeared in fair condition and no problems were noted. <br />