Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. 'Che comments include discussion of observations made during the <br />inspection. Comments also describe any enforcement actions taken during the inspection and the facts or <br />evidence supporting the enforcement action. <br />akeady repaired the slide azea. Repair steps included: informing the DMG of the slide, preparing <br />a map using GPS showing the extent of the mudslide onto undisturbed ground, and <br />mitigating the damage by removing the mud with a backhoe and thereby salvaging the topsoil <br />beneath the slide. SCC will revegetate the azea by hydroseeding. SCC did an excellent job of <br />mitigating the slide-damaged azea prior to the inspection and therefore no violation was issued. <br />To ensure continued compliance, please maintain a buffer zone between the topsoil removal line <br />and the disturbance boundary. <br />