Laserfiche WebLink
(Page 3) <br />MINE ID #` OR PROSPECTING ID # M-94-117 <br />INSPECTION DATE 2 9 96 INSPECTOR'S INITIALS ACS <br />The f'.ollowing problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />1 <br />CORRECTION <br />DATE <br />2 / 20 / 96 <br />PB or PV PB <br />TOPIC(S) HB <br />2. Hazel-A bulkhead liner not adequately affixed to the rib. 2 / 20 / 96 <br />Affix the plastic liner to the rib of the adit as was PB or PV PB <br />discussed in the Division's 1/23/96 inspection report. <br />TOPIC(S) HB <br /> <br />The pump-back svetem behind the coffer dam in the Hazel-A <br />adit is frozen, rendering the svstem inoperable. <br />