Laserfiche WebLink
ROADABLE EQUIPMENT ~~~ sheet 2 of 2~ <br /> Nearest major city or town within project area region : Ouray <br />Transportation Cvcle Time : Non- Total one-way travel distance : 4.0 miles <br /> Roadable Roadable Average travel speed : 20.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.20 0.20 Total non-roadable mob/demob cost ` : $588.57 <br />Return time (hours) = 0.20 0.20 • lwo round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost" : $0.00 <br />Unloading time (hoUrS) = 0.50 NA •• one rountl trip, no haul rig <br />Subtotals = 1.40 0.40 <br />............ <br />JOB TIME AND COST Total job time : 2.80 hours <br />Total job cost : $$89 <br />EQUIPMENT HAUL DISTANCE and TIME <br />