Laserfiche WebLink
CIRGES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Task # : 005 State :Colorado PermiUjob # :M-1980-171 <br />Date :07/14/2006 County :Ouray Abbreviation :none <br />User: KAP Site :Bachelor Mine Khedive Portal Filename:M171-005 <br />sheet 1 of 2 <br />Permit or other job action :Bond Recalculation Related To Inspection <br />Task description :MObIIIZe/DemobfliZe <br />EQUIPMENT~7RANSPORT RIG COST Shift~basis : 1 perday ~~ <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2005) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br /> Available riq capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Ownershipcost/hour: $25. 36 $28.12 $34.53 <br />Operating cost/hour : $36. 15 $37.62 $41.10 <br />Operator cosUhour : $27. 40 $27.40 $27.40 <br />Helpercost/hour: $0. 00 $25.15 $25.15 <br />Total Unit Cost/hour: $88. 91 $118.29 $128.18 <br />