My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC19808
DRMS
>
Back File Migration
>
Inspection
>
INSPEC19808
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:20:48 PM
Creation date
11/18/2007 9:32:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980171
IBM Index Class Name
Inspection
Doc Date
7/20/2006
Doc Name
Bond Recalculation related to Inspection
From
DMG
To
File
Inspection Date
6/15/2006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 07/14/2006 <br />User : KAP <br />State :Colorado <br />PermiUjob # :M-1980-171 <br />County :Ouray Abbreviation :none <br />Site :Bachelor Mine Khedive PoRal Filename :M171-001 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :Bond Recalculation related to Inspi <br />Task description :Place Rip Rap along Toe of Final <br />HOURLY EQUIPMENT COST <br />Horsepower: 138 <br />Weight (MT) : 19.70 <br />Cost Breakdown : Utilization <br />Ownership cost/hour : $27.78 NA Shift basis : 1 per day <br />Operating cosUhour : $34.68 100 Data source : (CRG) <br />Operator cosVhour : $32.72 NA <br />Total unit cosUhour : $95.17 Total Fleet cosUhour : $95.17 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 27 LCY factor : NA volume : 27 LCY <br /> <br />Source of estimated volume :Slope Reduction Drawing from previous Calculation <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION ;:. ; <br />Excavator Cvcle Time (load bucket swinc loaded dump bucket swing emotvl <br /> Basic job condition description : AVERAGE <br />Secondaryjob condition within basic description : AVERAGE <br /> Cycle time value : 0.28 minutes <br />Bucket Capacity <br />Rated bucket capacity : 1.05 LCY (heaped) Bucket size class : small <br />Bucket fill factor : 0.45 Rock -Poorly blasted (40% - 50%) <br />Adjusted bucket capacity : 0.47 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 8,500 feet Altitude adjustment : 0.87 (Cat HB) <br /> Job efficiency adjustment : 0.83 (1 shifl/day) <br /> Net job correction : 0.72 multiplier <br /> <br />Unadjusted hourly unit production : 99.82 LCY/hour <br />Adjusted hourly unit production : 72.08 LCY/hour <br />Adjusted hourly fleet production : 72.08 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 0.37 hours <br />Machine description :Cat 320C <br />Unit cost : $1.320 per LCY Total job cost : $36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.