Laserfiche WebLink
iiiiiiiuiiiiiuiii <br />B99 <br />of =o~ <br />F~R'8 COLORADO DIVISIGN O>h tvli,.r.RALS AND GEOLOGY <br />W.~; MINERALS PROGRAM INSPECTION REPORT <br />• ta,b • PHONE: (303) 866-3567 <br />The Division of Minerals and Geology has conducted an inspection of the mining operation noted below. This report <br />documents obsen'ations concerning compliance of the mining operation with the permit and the regulations o[ the <br />1Vlined Land Reclamation Board. The report notes 1) Areas of successful compliance; 2) Problems and suggested <br />corrective actions and/or 3) Possible violations to be considered for possible enforcement action by the Mined Land <br />Reclamation Board. OPERATORS SHOULD READ THIS REPORT CAREFULLY BECAUSE IT MAY REQUTRE <br />MINE NAME: Mundell Pit # 32 <br />COUNTY: BACA <br />INSPECTOR(S): Tony Waldron, <br />MINERAL: SDG <br />AI Amundson ~l <br />(~ OPERATOR: Baca County <br />, 51 ~n1 TYPE OF OPERATION: <br />rw v ~CY~~t1~ <br />Surface/110 <br />MINE ID # OR PROSPECTING H) #: M-95-019 ~ <br />INSPECTION DATE: 08/24/01 DATE OF COivIPLAINT: NA <br />INSPECTOR'S INITIALS: AJVV TIME OF DAY (tvHLiTARY): 14:00 <br />INSPECTION TYPE CODEot: PR POST INSP. CONTACTS°j: NONE <br />JOINT INSP. AGENCY CODEt'l: LG REASON FOR INSP. CODEtaI: IE <br />WEATHER CODEt'l: CR BOND CALCULATION TYPEt'l: NN <br />OP. REP. PRESENT: Jackie Carson <br />1. INSPECTION TYPE CODE -ICL-IN: IL=Illegal Operation, M111=M1lonitoring, A1P=Dlineral Prospect, SI=Surery-related, PR=Pre-operalionl <br />2. POST INSPECTION CONTACTS AND JOINT INSPECTION AGENCY COD& ICL-AG: NO=None, BL=6LM1I, CH=Colo. Dept. Htalth; CL=Land Board, <br />CT=Citizen; CW'=W'ildlile, FS=Foresl Service, FIYY=Hsvy. Dept., LG=Local Governm<n t, SE=State Engr.l <br />3. REASON FOR INSPECTION CODE- ICL-RS: AG=Other Agency Request, CT=Citizen Complaint, tE=Normal I&E Program, HP=High Priority, PY=Priority) <br />4. \VEATHER CODE -ICL-W'E: CL=Cloud}'. CR=CIeaq IN=Inclement -prevented inspection, ILN=Raining, SN=Snowing, WD=\\'indyl <br />5. BOND CALCULATION T7"PE: -IBC=Complete Bond, BP=Partial Bond, NN=None) <br />This list identifies the environmental and permit parameters inspected and gives a categorical evaluation of eachiF <br />PB OR PV IS INDICATED, YOU SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO <br />ASSURE COMPLLANCE WITH THE TERMS OF YOUR PERMIT AND APPLICABLE- RULES -AND <br />REGULATIONS. If PV is indicated, you will be notified under separate cover when the Mined Land reclamation <br />Board will consider possible enforcement action. <br />GENERAL INSPECTION TOPICS <br />(AR) RECORDS .............................................. Y (FN) FINANCIAL WARRANTY ........ N.4 (RD) ROADS........................ Y <br />(HB) HYDROLOGIC BALANCE ................. Y (BG) BACKFILL & GRADING........... Y (EX) EXPLOSIVES................ NA <br />_(PVV) PROCESSING WASTE/TAILiNG.... NA (SF) PROCESSING FACILITIES.... IYA (TS)TOPSOIL ...................... Y <br />(MP) GENL MINE PLAN COl\IPLLANCE . Y (FW) FISH & WILDLIFE .................... Y (RV) REVEGETATION....... . Y <br />(SM) SIGNS AND MARKERS ...................... Y (SP) STORM WATER NIGT PLAN... Y ($B) COMPLETE INSP........ . Y <br />(ES) OVERBURDEN/DEV. WASTE............ Y (SC) EROSION/SEDIMENTATION.. Y (RS) RECL PLAN/COMP.... . Y <br />(AT) ACID OR TOXIC hiATER1ALS ......... NA (OD) OFF-SITE DAMAGE ............... N.4 (ST) STIPULATIONS......... . NA <br />1' =Inspected and Found in Compliance <br />H =Not Inspected <br />PV = Inspected and Possible Violations Noted <br />NA =Not Applicablc <br />PB =Inspected and Problems Noted <br />H'HITE -PUBLIC FILE YELLOW' -OPERATOR PINT: -CORRESPONDENCE FILE <br />