Laserfiche WebLink
e .I <br />S <br />III. COMMENTS - COMPl1ANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts ar evidence supporting the enforcement action. <br />This was a complete inspection conducted by Joe Dudash of the Colorado DMG. Jim Stazk of the <br />DMG was also present. The operator was represented by Bill Bear. <br />Hydrology <br />No ponds were dischazging at the time of the inspection. The water level in pond B was a foot above <br />the primary, but the gate valve was closed, The water level in pond C was about 1 '/: feet below the <br />primary while pond D was dry. The gate valves on those ponds were closed as well. Pond <br />embankments appeazed to be stable. Spillways were functional. The sediment capacity of the ponds <br />was ample since ponds B and C had been cleaned out a few months ago. <br />All of the culverts and ditches azound the mine site were functional. However, a few items will need <br />maintenance soon. The outlet of culvert C-G4, that leads to the east end of pond D, will need some <br />cleaning, as does the culvert that goes under the main haul road where it intersects with the gob pile <br />haul road. Also, culvert C-C 12, that goes under the main haul road just below the portal bench, will <br />need cleaning soon.; ; <br />The straw bales aze in place at the designated SAE sites. However, one straw bale needs repositioning <br />along the entrance haul road. <br />There was only a little ponded water at the seep which is located to the west of the water tank bench. <br />The area was a little wet but no flo~x was observed. <br />Roads <br />All of the roads were passable at the mine site. The main paved haul road was in good shape. The gob <br />pile road was rather muddy neaz the top but was passable. The road to the water tank bench was snow <br />covered but passable. <br />Topsoil Stockpiles <br />There were no erosional problems with any of the topsoil stockpiles. The diversion ditch on the <br />northwest section of the main topsoil stockpile was functional. The collection ditches and straw bales <br />at that site were also functional. The straw bales at the gob pile and coverfill pile topsoil stockpiles <br />were in place. Topsoil stockpile signs were up. <br />