My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC19230
DRMS
>
Back File Migration
>
Inspection
>
INSPEC19230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:20:20 PM
Creation date
11/18/2007 9:29:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981229
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
6/17/1997
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br />• • <br />(Page 31 <br />MINE ID N OR PROSPECTING ID q M-81-229 <br />INSPECTION DATE 06/17/97 INSPECTOR'S INITIALS TDG <br />The following problems IPBI and/or possible violations IPVI land suggested corrective actions) were identified during this inspection. <br />The problems should be corrected by the dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation Board. The inspector noted <br />on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1 . No mine identification sign or affected area perimeter markers in place at site. 08/25/97 <br />PB or PV PB <br />Install a mine identification sign and perimeter markers as specified on page 2 TOPIC(SI _ <br />of this report by the date shown. SM, _, _ <br />r <br />2. Unclear as to whether any future disturbances are proposed within the 08/25/97 <br />"previously mined area" delineated on the mine plan map. PB or PV PB <br />TOPICIS) _ <br />Clarify whether any future disturbances are proposed for this area. MP, _, _ <br />3. Unclear as to whether sufficient quantities of topsoil or suitable plant growth material 08/25/97 <br />are available on site to meet the requirements of the approved reclamation plan. PB or PV PB <br /> TOPICISI _ <br />Provide information adequately demonstrating that sufficient quantities of suitable plant TS, RS, _ <br />growth material exist on site to fulfill the requirements of the approved reclamation <br />plan, and that sufficient quantities will be stockpiled on site and maintained until used <br />In final reclamation. <br />4. Existing financial warranty amount for the operation (517,500) is not sufficient to 08/25/97 <br />completely cover the estimated cost of final reclamation in the event of permit PB or PV PB <br />revokation and bond forfeiture. TOPICIS) _ <br /> FN, _, _ <br />Provide an additional 532,532 in bond monies to the Division, or provide a new <br />replacement warranty in the amount of 550,032 in which case the existing 517,500 bond <br />will be returned to the permittee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.