Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Petmittee/ Permit Field Visit <br />Person CAM MINING LLC Number C-020-81 Date 05/23/2007 Continuation Page <br />28. Performance Standard Categories <br />Codes: ]=Compliance. 2=Noncompliance, 3=Not Planned, 4=Not Started, S=Noncompliance Identified E sewhere, 6=Previously Cited <br />A. Administrative D. <br />1. 1 Mining within Valid Permit <br />2. 1 Mining within Bonded Area <br />3. 1 Terms & Conditions of Permit <br />4. 1 Liability Insurance <br />5. 1 Ownership and Control <br />6. 1 Temporary Cessation <br />7. 1 AML Rec. Fees --Non-Respondent <br />8. 1 AML Rec. Fees -- Failure to Pay g. <br />B. Hydrologic Balance <br />1. ] Drainage Control <br />2. 1 Inspections & Certifications <br />3. 1 Siltation Structures <br />4. 1 Discharge Structures F. <br />5. ] Diversions <br />6. 1 Effluent Limits <br />7. 1 Ground Water Monitoring <br />8. 1 Surface Water Monitoring <br />9. 3 Drainage -- Acid-Toxic Materials <br />10. 1 Impoundments <br />l 1. 1 Stream Buffer Zones G. <br />C. Topsoil & Subsoil <br />1. 1 Removal <br />2. ~ Substitute Materials <br />3. ] Storage and Protection <br />4. 1 Redistribution <br />Back611ing & Grading <br />1. 1 Exposed Openings <br />2. 1 Contemporaneous Reclamation <br />3. ] Approximate Original Contour <br />4. ] Highwall Elimination <br />5. 1 Steep Slopes (includes downslope) <br />6. 3 Handling of Acid & Toxic Materials <br />7. ] Stabilization (rills and gullies) <br />Excess Spoil Disposal <br />1. 3 Placement <br />2. 3 Drainage Control <br />3. 3 Surface Stabilization <br />4. 3 Inspections & Certifications <br />Coal Mine Waste <br />(Refuse PilesQmpoundments) <br />1. I Drainage Control <br />2. 1 Surface Stabilization <br />3. 1 Placement <br />4. 1 Inspections and Certifications <br />5. 1 Impounding Structures <br />Use Of Explosives <br />1. 3 Blaster Certification - <br />2. 3Distance Prohibitions <br />3. 3 Blast Survey/Schedule <br />4. 3 Warnings & Records <br />5. 3 Control of Adverse Effects - <br />Performance Standard Catagories E. Excess Spoil Disposal ...........................................(8] 6/8] 7.71-74) <br />3Q CFR Counterpart 1. Placement................................................................... ........................71(e) <br />A. Administrative .................................. .............................. <br />......... 2. Drainage Control ...................................................... ..........:...............710 I <br />I. Valid Permit ................................................... ..................................773.11 3. Surface Stabdrzation................................................. ..........................71(g) <br />2. Mining within Bonded Area ................. ...............................773.11 4. Inspections & Certifications...................................... .........................71(h) <br />3. Terms & Conditions of Permit ............... ..............................773.]7 F. Coal Mine Waste (Refuse Piles/]mpoundments) - -,-,($]6/817.81-84) <br />4. Liability Insurance ................................. <br />5. Ownership and Control .......................... ...............................800.60 <br />..............................778.13 <br />1. <br />Drainage Control ...................................................... <br />.........................83(a) <br />6. Temporary Cessation .............................. 842.11(e) & 816/817.]31 2. <br />3. Surface Stabilization................................................. <br />Placement ................... <br />. <br />. <br />.......................... <br />~ ~ ~ ~ .........................83(6) <br />............... 83 c <br />~ ( ) <br />7. AML Rec. Fees --Non-Respondant ....... <br />8. AML Rec. Fees -- Failure to Pay ........... .........................870.15(6) <br />..........................870.15(a) 4. . <br />. <br />........... <br />.. <br />Inspections and Certifications.................................... ......... <br />.......................83(d) <br /> 5. Impounding Structures............................................... ............................84 <br />B. Hydrologic Balance ........................... ...........(816/817.41-57) <br /> G. Use of Explosives .............................................. ....(816/817.61-68) <br />1. Drainage Control .................................... <br />ifications .....................................45 <br />49(a)Q <br />' <br />(d) <br />- <br />3. Siltation Strucmres ..................... <br />46 2. Distance Proh <br />bhions............................................... ...................... 61 <br />4. Dtscharge Stmctures ............................. ......................................47 3. Blast Survey/Schedule............................................... ........................62 64 <br />5. Diversions .............................................. .....................................43 4. Warnings & Records ................................................. .....................66 & 68 <br />6. Effluent Limits ....................................... .....................................42 5. Control of Adverse Effects........................................ .............................67 <br />7. Ground Water Monitoring ..................... .................................41(c) H. Subsidence Control Plan................................. ........(8]7.121-122) <br />8. Surface Water Monitoring .................... .................................41(e) I. Roads................................................................ .(816/817.150-151) <br />9. Drainage--Acid -Toxic Matertals .......... .................................41(f) <br />10. Impoundments ....................................... .....................................49 1. Road Construction..................................................... ......................I50(c) <br />ll. Stream Buffer Zones .............................. .....................................57 2. Certifica[ion............................................................... .......................151 (a) <br /> 3. Drainage........._..._ ..................................._............... ........_.150(6)-151(d) <br />C. Topsoil &Subsoil .............................. .................(816/817.22) 4. Surfacing and Maintenance....................................... ...........150(e)-I51(d) <br />1. Removal ................................................. .................................22(a) 5. Reclamation............................................................... .......................1500 <br />2. Substitute Materials ................................ .................................22(c) J. Signs &Markers............................................. ..........(816/8]7.11) <br />3. Storage and Protection ........................... <br />4. Redistribution ............... <br />.......................... ..................................22(c) <br />.22(d) <br />.............................. . <br />1. <br />Signs.......................................................................... <br />...........11(a),(b),&(c) <br /> 2. Markers ...................................................................... I1(a),(b),(db(e),&(~ <br />D. Backtilling & Grading .................... ..........(816/817.95-107) K. Distance Prohibitions...................................... .................(761.11) <br />1. Exposed Openings .....................816/817 .13, 14, I5, & 823.11 & 2] L. Revegetation.................................................... .(816/817.111-]]6) <br />2. Contemporaneous Reclamation ............... ...................................100 <br />3. Approximate Original Contour ................ ..........................102(a)(1) 1. Vegetative Cover....................................................... ................111 & 116 <br />4. Highwall Elimination ............................... ..........................102(a)(2) 2. Timing....................................................................... ...........................] 13 <br />5. Steep Slopes (includes downslope) ......... ...................................107 M. Postmining Land Use...................................... ........(816/817.133) <br />6. Handling of Acid & Toxic Materials ....... ...............................102(c) <br /> <br />7. Stabilization (rills and gullies) ................. <br />.................................95(6) <br />Rwised December 4, 1998 pa e 2 of <br />g <br />H. 3 Subsidence Control Plan <br />I. Roads <br />1. 1 Road Construction <br />2. 1 Certification <br />3. 1 Drainage <br />4. 1 Surfacing and Maintenance <br />5. 1 Reclamation <br />J. Signs & Markers <br />I. ] Signs <br />2. 1 Markers <br />K. 1 Distance Prohibitions <br />L. Revegetation <br />1. I Vegetative Cover <br />2. 1 Timing <br />M. 1 Postmining Land Use <br />N. Other <br />General <br />Performance <br />Catagory <br />2) <br />