My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC19207
DRMS
>
Back File Migration
>
Inspection
>
INSPEC19207
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:20:20 PM
Creation date
11/18/2007 9:29:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020
IBM Index Class Name
Inspection
Doc Date
6/5/2007
Doc Name
Inspection Report
Inspection Date
5/23/2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ q • 3-~ <br />U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MIl'~~ <br />M' S' E 1 ~ <br />me rte va cation ~y0 <br />State Program °';!g~o;,ofe s?OOI <br /> <br />1. Permittee/Person 9. Permit Number 9 ahpr maGo ] 0. Petmit Type <br /> CAM MINING LLC C-020-81 ~ PP <br /> 2. Address 11. Field Visit Date 12. Purpose 13. SRA Present <br /> P.O. BOX 98 05/23/2007 ~ Y^ <br />3. City 4. State mm - dd - yyyy <br /> <br />Loma CO ]4. Permit Status I5. Site Status ]6. Facility Type <br /> IN MC BE <br />5. Zip Code 6. Phone Number <br /> 17. OSM Office # 18. CCID # 19. Land Code <br />81524 (970)858-3960 140 ~ SF <br />7. Operator Name, if Different than Permittee <br /> 20. M.S.H.A ID # 21. State Abrev. 22. County Name <br /> GARFIELD <br />8 <br />Mine Name OS-03119 CO <br /> . <br /> - 23. AVS Permittee Entity ]D Number 24. State Office <br />HUNGER CANYON 056839 <br />25. Hours 26. 'ignature Block 27. Reviewing <br />Official: <br />2.0 a. Permit Review A <br />~ V ~L <br />i <br />C/lA <br />7 <br />0 b. Site Visit Time ~ ature: ~- D7 . <br />. <br />Signature: <br />, HENRY AUSTIN ID # 116 rr~ <br />Travel Time <br />g <br />0 c Review Date: 7 / 3°% ~h 7 <br />, <br />. Printed Name: mm - dd - yyyy <br />2,p d. Report Writing Date: 05/29/2007 Is Supplemental MSE Page Used Y/N Y^ <br />Permit Type -item 10 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR....Citizen Complaint Referral (non site visit) <br />pxx.,,,Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection -Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 14 AB....Abandoned: All surface and underground coal minin8 activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(8) <br />ppermitted but not yet disturbed. AB1..Bond Forfeiture: Bond forfeiture officially in process or completed, and. <br />IN....Inactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) AB2..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR... Bond Release: Reclamation completed and State Regulatory A63.. Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase 111 Release.) NA...Not Applicable: When site is unpermitted. <br />Site Status Codes -Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND.. No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending The RA is pursuing <br />t <br />h <br />i <br />h <br />b <br />t <br />d <br />i <br />k <br />i <br />ons to revo <br />e the perm <br />t, collec <br />operat <br />ons <br />ave <br />een s <br />arte <br />t <br />e <br />. site regraded and awaiting phase bond release. act <br />EX..Coal Exploration: Coal exploration operations TC..Temporary Cessation: The RA has granted performance bond(s), andlor reclama- <br />have started and where coal mining operations cessation of mining pursuant to 30 CFR 816/ lion of forfeited site is in progress. <br />have not begun. 817.131((b). FR.. Forfeited and Reclaimed: Forfeiture <br />A <br />l P <br />Ph <br />Ph <br />I b <br />l <br />i <br />C <br />d <br />C <br />l <br />rf <br />i <br />P <br />I R <br />A <br />l <br />d <br />l <br />ro <br />ace m <br />elease: <br />east <br />release rec <br />amation comp <br />AP.. <br />ct <br />ve <br />oa <br />ucing: <br />oa <br />su <br />ning <br />1... <br />ase <br />t <br />ase <br />on <br />eted. <br />activities are occurring. granted for entire permitted area. For interim FO..Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bond. <br />facility such as tipple or preparation plant. P2.. Phase II Release: At least Phase II bond release WC.Wildcat: Coal mining and reclamation <br />NM..No Mining: The Permit Status is active, site is for the entire permitted area. operations have or are taking place and <br />not in Temporary Cessation, no surtace coal p3.. Phase III Release: Reclamation completed and the activity is not covered byy the <br />mining activity, and site not regraded. the RA has released all bond. required permits from the RA. <br />Facility Type Codes -Item 16 D...Ancillary (Haulroad, Conveyor, and/or Rails) H...Exploration Permits L... Remining site ppermined <br />A... Surface E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR765.25 <br />B... Underground F... Loadingg Facility and/or Tipple J... Exempt 16 and 2/3 <br />C... Preparation Plant G...Stockpiles K...Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and ] 0 Regional Fairness Boazds were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each, a encv's <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees including those of affiliates) page 1 of <br />and wish to comment on the enforcement or compliance activities of OSM, call 1-888-REG-FAIR (I-888-734-3247). ae„tea o«.~.a, is9s <br />
The URL can be used to link to this page
Your browser does not support the video tag.