Laserfiche WebLink
"'~ r ( Page 3 ) <br />7 <br />MINE ID # OR PROSPECTING ID # M-84-099 <br />INSPECTION DATE 7 6 INSPECTOR'S INITIALS CLK <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. The current reclamation work required by the Army Corps Aug.7, 1998 <br />of Engineers is not included in the DMG reclamation PB or PV PB <br />permit. This is in violation of Rule 6.4.5(2). TOPIC(S) ~R <br />CORRECTIVE ACTIONS: The Operator must submit a <br />Amendment to the permit to include the new reclamation <br />work, new affected area, and new setback (or lack of <br />same) from the river by August 7, 1998. <br />2 <br />3 <br />PB or PV <br />TOPIC(S) <br />PB or PV <br />TOPIC(S) <br />