Laserfiche WebLink
<br />(Page 3) <br /> <br />MINE ID ~ OR PROSPECTING ID ~ M-77-247 <br />INSPECTION DATE July 6, 1995 INSPECTOR'S INITIALS TAS <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Nined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. Stormwater controls have not been completed as September 30, <br />originally requested from the November 2, 1994 1995 <br />inspection. PB or PV PB <br />TOPIC(S) HB, <br />SC, RD <br />Complete installation of all necessary stormwater <br />controls including collection ditches, sediment pond <br />emergency spillway, and other controls ae presented in <br />the March 22, 1995 Stormwater Management Plan. <br />2. <br />PB or PV <br />TOPIC(S) <br />3. <br />PB or PV <br />TOPIC(S) <br />