Laserfiche WebLink
• (Page 2) • <br />MINE ID # OR PROSPECTING ID # M-91-097 <br />INSPECTION DATE 11/12/98 <br />INSPECTOR'S INITIALS RCO <br />This inspection was performed by the Division as part of its monitoring of 110 construction <br />material permits and to perform a pre-operation inspection of the lands proposed to be <br />included in the permit as part of the recently submitted 112 conversion application. The <br />operator was contacted about the inspection, and was present throughout the inspection. <br />I. Monitoring of the Existing 110 Permit: <br />The permit ID sign was observed posted at the north entrance to the site. The corners are <br />marked by steel T-posts sheathed in white PVC pipe. <br />The topsoil stockpile was enlarged during 1998 when the unmined portions of the pit were <br />stripped. That material was added to the existing topsoil berm along the west edge of the <br />permit. It has not been revegetated yet because it will be moved during 1999 after the <br />permit area is expanded. <br />The mining in the pit is about 30 feet deep, and expanding to the west. There is still a <br />small amount of material still available to be mined before the limits of the pit are <br />reached. There is no new digging on the east or south walls of the pit; they are still at <br />3:1 slopes and vegetated, though they are not yet topsoiled. The powerpole on the east wall <br />is stable. A ramp down into the pit is on the north end. The bottom of the pit exhibits no <br />sign of impounded water. <br />There are a few stockpiles of crushed gravel on the northeast part of the permit where it is <br />not yet mined. A wheeled loader was the only piece of equipment present during the <br />inspection. Virtually the entire permit area is disturbed. <br />I2. Pre-operation Inspection of the Area Proposed in Conversion Application CN-O1: <br />The area west of the existing permit area, adjoining the west edge of the permit and <br />extending to the highway right-of-way, will be added. It is currently level and exhibits <br />rangeland vegetation. <br />South of the existing pit is an old mill building, which still houses a significant amount <br />of dilapidated gold milling and concentrating equipment. The application states that this <br />facility will be removed from the site prior to any gravel mining activity in that area. The <br />building is corrugated metal, with concrete floor, steel beam construction, finished offices <br />and assay lab. It is fully wired and plumbed, but is in disrepair. It is presumed that the <br />conversion application also includes some type of characterization of the materials still <br />present in that building, the vats outside, and the tailings pond down the hill to the east. <br />Outside the metal mill building are a couple conveyors, hoppers and earthen loadout <br />associated with the operation of the mill. These will also be removed. There are two small <br />galvanized buildings present which will remain. <br />There is an overhead powerline passing through the site between the permit area and the mill <br />building, in addition to the one on the east edge of the existing pit. These will be removed <br />or relocated out of the path of mining disturbance. The operator is contacting DMEA, the <br />owner of those structures. <br />There are a few small ditches along the shoulder of the slope, which currently serve to <br />convey irrigation water. These will be removed, relocated or piped. This is not to be <br />disturbed during the first phase of the expansion, but the operator must contact the owners <br />of those structures prior to any disturbance, and provide any commitments or agreements to <br />this office- <br />