Laserfiche WebLink
SUPPORT FACILITIES <br />An office building and associated pazking azea still remain at the Oak Creek facilities area. There was <br />no sign of recent activity or change in condition. <br />See the discussion above for the condition of sedimentation ponds. There was no indication observed <br />that maintenance work had been started on the String of Peazls check dams. <br />TOPSOIL <br />A small area, associated with the reclamation of long-term-mining facilities adjacent to Oak Creek, <br />requires placement of topsoil. There was no sign of recent activity. <br />FISH AND WILDLIFE <br />Ducks were observed at the ponds. <br />SLIDES AND DAMAGE <br />Some of the check dams of the "string of peazls" need maintenance work. See Support Facilities above. <br />OTHER <br />The sites of potential curb cuts from the North Haul Road to parcels of private property were inspected <br />(Champlin and Walker). No problems with the proposed cuts (a potential revision to the PAP) were <br />identified. <br />C-1980-001 Coal Partial Inspection of September 9, 2005, Page 4 of 5 pages. BGW <br />