Laserfiche WebLink
t- •^a';. ~ - ~.. <br />4r <br />ling up cement cap and coiiai <br />Cement grout was added to a depth of 100 feet (target was 101 feet). The grout set up <br />Tuesday evening and the depth was confirmed at 100 feet on Wednesday morning prior to <br />the dumping of pit run material. As pit run rock was dumped, the concrete cap and collar <br />material was broken and pushed into the hole. Mr. Whipkey was aware that the pit run was <br />