Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ KERB COAL CO. Permit C-ooh-80 Field visit 06/19/2007 Continuation Page <br />Person Number Date <br />28. Pertormance Stan <br />,3=Not Planned,4=Not Started,S=Noncom) <br />B. <br />C. <br />Administrative <br />1. 1 Mining within Valid Permit <br />2. 1 Mining within Bonded Area <br />3. 1 Terms & Conditions of Permit <br />4. 1 Liability Insurance <br />5. 1 Ownership and Control <br />6. 1 Temporary Cessation <br />7. 1 AML Rec. Fees --Non-Respondent <br />8. 1 AML Rec. Fees --Failure to Pay <br />Hy drologic Balance <br />1. 1 Drainage Control <br />2. 1 Inspections & Certifications <br />3. 1 Siltation Structures <br />4. ] Discharge Structures <br />5. 1 Diversions <br />6. 1 Effluent Limits <br />7. 1 Ground Water Monitoring <br />8. 1 Surface Water Monitoring <br />9. 3 Drainage --Acid-Toxic Materials <br />] 0. 1 Impoundments <br />11. 1 Stream Buffer Zones <br />To psoil & Subsoil <br />1. 1 Removal <br />2 ~ Substitute Materials <br />3. 1 Storage and Protection <br />Elsewhere, 6=Previously Cited <br />H. 3 Subsidence Control Plan <br />I. Roads <br />1. 1 Road Construction <br />2. 1 Certification <br />3. 1 Drainage <br />4. 1 Surfacing and Maintenance <br />5. ]Reclamation <br />J. Signs & Markers <br />1. 1 Signs <br />2. 1 Markers <br />K. 1 Distance Prohibitions <br />L. Revegetation <br />1. 1 Vegetative Cover <br />2. 1 Timing <br />M. 1 Postmining Land Use <br />N. Other <br />neral <br />ormance <br />agory <br />D. Backfilling & Grading <br />1 . 1 Exposed Openings <br />2 . 1 Contemporaneous Reclamation <br />3 . 1 Approximate Original Contour <br />4 . 1 Highwall Elimination <br />5 . 3 Steep Slopes (includes downslope) <br />6 . 3 Handling of Acid & Toxic Materials <br />7 . 1 Stabilization (rills and gullies) <br />E. Excess Spoil Disposal <br />1 . 3 placement <br />2 . 3 Drainage Control <br />3. 3 Surface Stabilization <br />4. 3 Inspections & Certifications <br />F. Coal Mine Waste <br /> (Refuse Piles/Impoundments) <br />1. 3 Drainage Control <br />2. 3 Surface Stabilization <br />3. 3 Placement Ge <br />4. 3 Inspections and Certifications Perf <br />5. 3 Impounding Structures Cat <br />G. U se Of Explosives <br />1. 3 Blaster Certification - <br />2. 3 Distance Prohibitions <br />3. 3 Blast Survey/Schedule - <br />4. 3 Warnings & Records <br />5. 3 Control of Adverse Effects - <br /> Performance Standard Catagories <br /> 30 CFR Counterpart <br />A. Adminis[rative ................................................... ...................... <br />1. Valid Permit ......................................................................... ............773.1] <br />2. Mining within Bonded Area ..................................... ...........773.11 <br />3 . Terms & Conditions of Permit .................................. ...........773.17 <br />4. Liability Insurance ..................................................... ...........800.60 <br />5. Ownership and Control .............................................. ..........778.13 <br />6. Temporary Cessation ..............................842.11(e) & 816/817.131 <br />7. AML Rec. Fees --Non-Respondant .......................... ......870.15(6) <br />8. AML Rec. Fees -- Failure to Pay ............................... ......870.15(a) <br />E. Excess Spoil Disposal ...........................................(816/817.7]-74) <br />1. Placement ............................................................... ............................71(e) <br />2. Drainage Control ................................................... ............................ 71(fl <br />3. Surface Stabilization .............................................. .............................71(g) <br />4. Inspections &Certifications ................................... ............................71(6) <br />F. Coal Mine Waste (Refuse Piles/lmpoundments) ,,,,,($16/817.81-84) <br />1. Drainage Control ................................................... ............................83(a) <br />2. Surface Stabilization ............................................... ...........................83(6) <br />3. Placemen[ ................................................................ ...........................83(c) <br />4. Inspections and Certifications ................................. ..........................83(d) <br />5 Impounding Structures 84 <br />B. Hydrologic Balance ......................................(816/817.41-57) <br />G. Use of Explosives ..................................................(816/817.61-68) <br />1 Drainage Control .. ........ 45 <br />2. Inspections &Certifications ........................... ..................49(a)(10) <br />3. Siltation Structures ......................................... .............................46 <br />4. Dischazge Structures ...................................... .............................47 <br />5. Diversions ....................................................... ............................43 <br />6. Effluent Limits ............................................... .............................42 <br />7. Ground WaterMonitoring .............................. ........................4](c) <br />8. Surface Water Monitoring .............................. ........................41(e) <br />9. Drainage--Acid-Toxic Materials ................... ........................41(f) <br />10. Impoundments ................................................ ............................49 <br />11. Stream Buffer Zones ...................................... .............................67 <br />C. Topsoil &Subsoil ...............................................(816/817.22) <br />1. Removal ..................................................................................22(a) <br />2. Substitute Materials .................................................................22(c) <br />3. Storage and Protection .............................................................22(c) <br />4. Redistribution ..........................................................................22(d) <br />D <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />1. Blaster Certification ................................................. ..........................61(c) <br />2. Distance Prohibitions ............................................... ..........................61(d) <br />3. Blast Survey/Schedule ............................................. ..........................62-64 <br />4. Warnings & Records ............................................... .......................66 & 68 <br />5. Control of Adverse Effects ...................................... ...............................67 <br />H. Subsidence Control Plan ............................... ..........(817.127-122) <br />I. Roads ............................................................... ..(816/817.150-151) <br />1. Road Construction ................................................... ........................150(c) <br />2. Certification ............................................................. .........................I51(a) <br />3. Drainage ................................................................... ............150(6)-151(d) <br />4. Surfacing and Maintenance ...................................... ............150(e)-]51(d) <br />5. Reclamation ............................................................. .........................1500 <br />J. Signs & Markers .......................................................(816/817.11) <br />1. Signs ............. <br />2. Markers........ <br />Backfilling & Grading ..............................(816/817.95-107) K <br />Exposed Openings .....................816/817.13, 14, I5, & 823.11 & 21 L. <br />Contemporaneous Reclamation ......................... .........................100 <br />1 <br />Approximate Original Contour .......................... . <br />................102(a)(1) <br />2 <br />Highwall Elimination ........................................ .................102(a)(2) <br />. <br />Steep Slopes (includes downslope) ................... .........................107 M, <br />Handling of Acid & Toxic Materials ................. .....................102(c) <br />Stabilization (rills and gullies) ........................... .......................95(6) <br /> <br />Distance Prohibitions .......................................................{761.11)1 <br />Revegetation .....................................................(816/817.] I1-116) <br />Vegetative Cover .......................................................................111 & 116 <br />Timing .................................................................................................. ] 13 <br />Postmining Land Use ..............................................(816/8] 7.133) <br />a.~,P~ak.mM.a ~4oa Page 2 of <br /> <br />