Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />RECEN~~ E OF SURFACE MINING <br />ine Site Evaluation <br />JUL 19 2007 State Program <br />1. Permittee/Perso~ivision of ec a fet 9. Permit Number ] 0. Permit Type <br /> KERB COAL CO. C-006-80 PP <br /> 2. Address 11. Field Visit Date 12. Purpose 13. SRA Present <br /> PO BOX 459 06/19/2007 <br />3. City 4. State mm - dd - yyyy <br /> <br />CO <br />Fl ] 4. Permit Status I5. Site Status ] 6. Facility Type <br />orence IN P] AF <br />5. Zip Code 6. Phone Number <br /> 17. OSM Office # 18. CCID # 19. Land Code <br />81226 (719)784-6395 <br />140 ~ SF <br />7. Operator Name, if Different than Permittee <br /> 20. M.S.H.A ID # 21. State Abrev. 22. County Name <br /> JACKSON <br /> OS-02674 CO <br />8. Mine Name <br /> 23. AVS Permittee Entity ID Number 24. State Office <br />MARR STRIP <br /> 056814 <br />25. Hours 26. gnature Block 27. Reviewing Official: <br />1.0 a. Permit Review <br /> gnat Ire: 'j f I Uj d ~ Signature: <br />0 b. Site Visit Time <br />4 <br />. HENR STIN ID # 116 <br /> <br />Travel Time <br />0 c <br />5 Review Date: / / <br />. <br />. Printed Name: mm - dd - yyyy <br />1.5 d. Report Writing Date: 07/10/2007 Is Supplemental MSE Page Used Y/N Y^ <br />Permit Type -Item 10 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR... Citizen Complaint Referral (non site visit) <br />p~_...Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxz..... Federal Actions CCF....Citizen Complaint Follow-up <br />Joint Inspection -Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 14 AB....Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(8) <br />Permitted but not yet disturbed. A61 .Bond Forfeiture: Bond forfeiture officially in process or completed, and. <br />IN.... nactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) AB2..Partially Reclaimed Forfeiture: Forteited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR... good Release: Reclamation completed and State Regulatory AB3.. Reclaimed Forfeiture: Forfeitetl site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA...Not Applicable: When site is unpermitted. <br />Site Status Codes -Item 15 NS..Non-Site Visit: Status of site not determined. <br />ND..,No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending The RA is pursuing <br />operations have been stoned. site regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />EX.. Coal Exploration: Coal exploration operations TC..Temporary Cessation: The RA has granted performance bond(s), andlor reclama- <br />30 9 FR 816/ <br />i <br />f <br />i <br />have started and where coal mining operations cessat <br />on o <br />min <br />ng pursuant to <br />lion of forfeited site is in progress. <br />have not begun. 617.131(b). FR..Forteited and Reclaimed: Forfeiture <br />I b <br />l <br />rf <br />i <br />i <br />P <br />Ph <br />I R <br />l <br />A <br />l <br />Ph <br />d <br />on <br />re <br />AP.. Active Coal Producing: Coal su <br />ace m <br />n <br />ng <br />1... <br />ase <br />e <br />ease: <br />t <br />east <br />ase <br />ease reclamation completed. <br />activities are occurring. granted for entire permitted area. For interim FO..Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bond. <br />facility such as tipple or preparation plant P2.. Phase II Release: At least Phase II bond release WC.Wildcat: Coal mining and reclamation <br />NM..No Mining: The Permit Status is active, site is for the entire permitted area. operations have or are taking place and <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the activity is not covered by the <br />mining activity, and site not regraded. the RA has released all bond. required permits from the RA. <br />Facility Type Codes -Item 16 D...Ancillary (Haulroad, Conveyor, and/or Rails) H...Exploration Permits L... Remining site permined <br />p <br />A... Surtace E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR <br />85.25 <br />B... Underground F... Loading Facility and/or Tipple J... Exempt 16 and 2/3 <br />C... Preparation Plant G... Stockpiles K...Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each a encv's <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees including those of affiliates) page 1 of <br />and wish to comment on the enforcement or compliance activities of OSM, call 1-888-REG-FAIR (1-888-734-3247). x~~:oa oeremnera, i~se <br />