Laserfiche WebLink
RECLAl1AT ION COST SUMMARY cant'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Deccri ptlon ~ Cost (f) <br />Subtotal (K): <br />Gevvevavavca <br />L. DRILL HOLE/MONITORING NELL SEALING <br />Task No.~ Task Description ~ Cost (f) <br />, <br />Subtotal (L): <br />vvovvvvvava <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Descri ptfon ~ Coat (f) <br />2 ~ De watering ~ (38,000 <br />Demolition <br />7 ~ feeding ~ f62,818 <br />Fencing <br />1 ~ Mob/Demob ~ f2,661 <br />Subtotal (M): 1103,479 <br />eacca:Ga:cvG <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): f224,781 <br />GCGGpCGCGGGG <br />II. INDIRECT COSTS <br />________________________________________________________a___G___________ <br />A. CONTRACTOR'S OVERHEAD $ PROFIT <br />Item No.~ Item Description ~ Cost (f) <br />________I__________________________~_______....____..»_..I.__.________ <br />1. ~ Public Liability Insurance.... 1.550% of dir. ~ f3,484 <br />2. ~ Contractor's Performance Bord 0.975% of dir. ~ f2, 192 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ (22,478 <br />4. ~ Job Superintendent.. ~ <br />f:btotal (A): (28,154 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (di reef plus D f P): f252, 934 <br />evavvvveaGGa <br />B. DNG PROJECT ADMINISTRATION EXPENSES <br />Item No.~ Item Description ~ Coat (f) <br />1. ~ Ninera is Program Admin. fee et 5.00% of cntr.~ f12,647 <br />NET INDIRECT COST PERCENTAGE: 18.15% Subtotal (B): (12,647 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): (40,801 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus if:direct costs): 5265, SB1 <br />eGGGGGGGGGGa <br />