Laserfiche WebLink
<br />,.r <br />~~ <br />RECLAMATION COST SUMMARY eont~d sheet 3 of 4 <br />X. EARTHHORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (S) <br />S:btotal (M): <br />.~___==~~=v. <br />I. EARTNYORK - DRAINAGE CONTROL SYSTEM IMSTALLATI ON/REMOVAL <br />Task No.~ Task Descri ptlon ~ Coat (f) <br />J. EARTHNORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description <br />Subtotal U>: <br />Coat (f) <br />5 ~ Haul topsoil from stockpiles and dunp et site to <br />be spread <br />6 ~ Spread topsoil <br />f87,154 <br />19,432 <br />Subtotal (J): (96,586 <br />C G <br />