Laserfiche WebLink
' c. ~ • ( Page 3 ) • <br />MINE ID # OR PROSPECTING ID # M-94-117 <br />INSPEC:CION DATE 3-31-98 <br />INSPECTOR'S INITIALS GC <br />CORRECTION <br />DATE <br />1. Water is overtopping the Hazel A bulkhead and 4-17-98 <br />is being pumped back to the tailings pond PB or PV PB <br />with the coffer dam pump. This pump is not TOPICS} HB <br />designed for the task. <br />Corrective Action: No later than 4-16-98, <br />submit to the Division and get approved a <br />plan to ensure continued pumping from the <br />Hazel R adit. Complete the corrective action <br />no later than 4-17-98. <br />2. The pump back system between the mill and the 4-27-98 <br />Hazel-A adit is in disrepair and the PB or PV PB <br />evaporative system is not operational. TOPIC(S) SF <br />Corrective Action: Repair or replace the pump <br />behind the Hazel-A bulkhead, repair all <br />broken lines in the system, close the decant <br />line between the tailings pond and the Hazel- <br />A adit, and bring the pump back and <br />evaporative system into proper operating <br />order no later than 4-27-98. <br />3 <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />PB or PV <br />TOPIC(S) <br />