My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC18351
DRMS
>
Back File Migration
>
Inspection
>
INSPEC18351
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:19:43 PM
Creation date
11/18/2007 9:25:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
4/11/2006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. CORINIENTS - COIVIPLIriNCE <br />~re,Ipw fire coatzments nn the inspection- The comments inrlnd? disr,,~ssion of observations made during the_. <br />inspection. Comments also describe any enforcement actions taken during the inspection and the facts or <br />evidence supporting the enforcement action. <br />T here have not been any additions to gob pile no, l .The haul road was in good condition and <br />collection and diversion ditches were functional. The underdrain was exposed to the rear of the pile, as <br />designed. The top of the gob pile had positive drainage. <br />The haul road leading up to gob pile no. 2 was in good condition. The top of gob pile no. 2 had <br />positive drainage. The operator has been placing less material on the pile than in recent months. The <br />collection and diversion ditches were functioning properly. The gob pile outslopes were stable. T'he <br />two underdrains were exposed in the back of the pile. <br />There was only a little standing water in Pond F. The discharge pipe float and pump were in place. The <br />pond embankment was stable and the ditches leading into the pond had sufficient capacity. Straw bales <br />were in place at Lhe pump house across the highway. <br />Unit Train Loadout <br />There was a loaded unit train on site. No problems with fugitive dust were observed. The bench <br />outslope was well vegetated and stable. Collection and diversion ditches were functioning properly. <br />The road leading to the Loadout was dry and in good condition. There was no standing water in Pond J <br />and Pond K. The embankments of the two ponds were stable and spillways were functional. The mine <br />ID sigm was up, as were the surface disturbance markers. There were no erosional problems with the <br />main topsoil stockpile. <br />Records <br />The mine records were found to be in compliance, as documented in the following records checklist. <br />c:/word/bowie2iinsp040ti <br />
The URL can be used to link to this page
Your browser does not support the video tag.