Laserfiche WebLink
inspection of the site with the Delta County Weed Contro] Program Coordinator during <br />May to determine weed species present at the site and locations of the infestations. This <br />will be the first active step in the Weed Management Plan. Control will begin in May- <br />June of 2003. <br />I am prepared to submit a Technical Revision to document the inclusion of the Weed <br />Management Plan and the species substitution for Russian Olive as part of the approved <br />plans for this site. What do you think, Steve? Is the Plan OK or do we need to make <br />changes? <br />I have contacted Liberty Mutual to get a rider to the existing Reclamation Bond (Liberty <br />Mutual 14-006-903) for this permit. The rider will increase the Reclamation Bond for this <br />site from $3,005.00 to $4,385.00 as requested. <br />Sincerely, <br />~c~< -~.4~~ - <br />Richard Johnson <br />Resource Manager <br />