My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - M1981302 (21)
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1981302
>
_INSPECTION - M1981302 (21)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2022 2:53:33 PM
Creation date
11/18/2007 9:19:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981302
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
12/22/1994
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• (Page 4) • <br /> MINE ID # OR PROSPECTING ID 1 M-81-302 <br /> INSPECTION DATE 12/22/94 INSPECTOR'S INITIALS TAS <br /> The following problems (PB) and/or possible violations (PV) (and suggested corrective <br /> actions) were identified during this inspection. The problems should be corrected by the <br /> dates given, or they will become possible violations. The possible violations should be <br /> corrected by the dates given to reduce their severity when considered by the Mined Land <br /> Reclamation Board. The inspector noted on the previous page should be notified of all <br /> corrective actions taken. <br /> PROBLEMS/POSSIBLE VIOLATIONS <br /> AND <br /> CORRECTIVE ACTIONS <br /> CORRECTION <br /> DATE <br /> 1. Water rights adequate for processing and final 05/21/95 <br /> reclamation, in the form of Well Permit 37739F, PB or PV: PB <br /> for the Deeps Farm Pit have not been secured by TOPIC(S) AR,HB <br /> Western Mobile, Inc. <br /> Complete State Engineers Office requirements for <br /> water rights at the Deepe Farm Pit for process water <br /> ponds and reclaimed ponds/lakes OR the Division will <br /> require an additional reclamation bond for the cost of <br /> dewatering, backfilling, topsoiling, and revegetation <br /> of existing ponds/lakes. <br /> 2. The existing reclamation plan has no provisions for 05/21/95 <br /> reclamation of the processing plant site. Costs for PB or PV: PB <br /> remaining reclamation responsibilities should be TOPIC(S) SF,FN <br /> calculated to ensure the site is adequately bonded. <br /> Submit reclamation plane for the processing plant site <br /> and revised reclamation costs for all remaining <br /> responsibilities in the form of an application for a <br /> revision. <br /> 3. <br /> PB or PV <br /> TOPIC(S) <br />
The URL can be used to link to this page
Your browser does not support the video tag.