My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC17213
DRMS
>
Back File Migration
>
Inspection
>
INSPEC17213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:18:59 PM
Creation date
11/18/2007 9:19:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974015
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
4/13/1999
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />MINE ID # OR PROSPECTING ID # M-74-015 <br />INSPECTION DATE 04/13/99 <br />INSPECTOR'S INITIALS ESC <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered bpi the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />DATE <br />1. The mining and reclamation permit is not current with the site <br />conditions and the Construction Material Aules and Regulations <br />(Rules 6.4.4 & 6.4.5). <br />CORRECTIVE ACTION: <br />The operator will need to file an amendment to Permit M-74-015 <br />to change the final approved land use, include a map showing the <br />permit boundary, location of the slurry wall and a certified <br />construction report detailing the as-built" conditions. The <br />amendment (or separate technical revision) will also need to <br />update the permit with the low-water crossing, the topsoil <br />replacement depth, actual seed mixture used on site and the <br />approved augmentation plan. The amendment, or separate <br />technical revisions, will need to be filed within 60 days of <br />receipt of this inspection report. <br />(Page 4) <br />6) Davs of <br />R-~ceipt <br />P:3 or PV:PB <br />TOPIC (S):MP&AR <br />r ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.