Laserfiche WebLink
<br />ppp ~ (Page 3) <br />ID *~1~~~ ID if M-82-131 ~ ~ <br />'ECTIOi EI INS$ECTOR'S INITIALS CLK <br />T¢e follgwipg prob 'me (PB) and/or possible violations (PV) (and suggested corrective <br />ac(tions) ~e ijde t ie)3 during this inspectign. The problems should be corrected by the <br />dates given, or t~e Twill become possible violations. The poseible~violatione should be <br />corrected by! theda s given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions t) ken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. Boundary markers must be installed, and proof of their March 7, 1996 <br />installatiQn,4photos) sent to DMG within 30 days. This PB or PV PB <br />ie in~accorda ce with Rule 3.1.12(2) of the TOPIC(S) SM <br />Construction. aterials Rules and Regulations. <br />2. <br />PB or PV <br />TOPIC(S) <br />3. <br />PB or PV <br />TOPIC(S) <br /> <br />