Laserfiche WebLink
(Page 2) • _ <br />ID ~i~ E TryG ID ;f M-82-131 ~ ~, ". <br />I SPECTI T ~ 9 INSPECTOR'S ~I NITIALS CLK <br /> <br />OBSERVATIONS <br />The followirJd~ mb~jer tions were made during a routine inspection of the site. The main, <br />center section of t~ Bite i.s currently in the process of being reclaimed. The new areas <br />added in the last am ndment have not been disturbed yet (except for equipment being stored <br />on the northern sect on). <br />1, Slopes along the northerr.~ and southern aides of the main pit are not quite at 3:1 yet - <br />they are clgser to 2 5:1. Thi.e is not a problem now, but the pit sides will need to be more <br />carefully graded pef re this portion of the site is eligible for release. There should be <br />nq problem in accomp fishing this, since the operator has preserved an adequate setback from <br />the property lineg a d roads. <br />2. There are no b~undary rnarkere along the northern aide of the site. This led to a <br />temporary misunde et nding, and a belief that the operator was outside the permit boundaries <br />(when this was no~ t e case). Boundary markers should be installed, and proof sent to DMG <br />within 30 days. <br />3.. Markers along th edstern boundary would be an improvement. It is understood that there <br />is some difficulty i gaining access to this portion of the site, but any markers along this <br />boundary would help clarify the areas owned and operated by Bucklen Equipment and those <br />operated by the City of Greeley. <br />4. It appears there a enough topsoil to finish reclamation of the currently disturbed area, <br />and ae the pit wi~.l kecome a pond when it fie finished, there are no hydrology problems. <br />NAME Susan 8~uc~clen <br />OPERATOR BuC"k len Eq <br />STREET 804804 North,~_2S <br />CITY/STATE/ZIP Greel <br />i~~, tl Y,~~ ~ ~ iIV~ d: <br />cc: Carl B. Mount, DMG <br />^ CE <br /> ^ BL <br /> ^ FS <br /> ^ HW <br /> ^ HMWMD (CH) <br />^ SE <br />^ WQCD (CH) <br />^ OTHER <br />