Colowyo C-1981-019 <br />14~ry 2007 <br />Pg 5/5 ~C/ <br />General Mine Plan Compliance (cont): -The operator was dumping overburden in <br />the mid-pit area of the West Pit. <br />-The mining at the Colowyo Mine appears to be progressing as discussed and <br />approved in the PAP. <br />Air Resource Protection: -All of the areas of the mine were well compacted and <br />stable at the time of the inspection so there were no problems with fugitive dust. <br />There were also no problems with fugitive dust at the coal stockpile at the Gossard <br />Loadout. <br />Excess Spoil: -The reclaimed portions of the West Pit spoil pile were well vegetated <br />and appeared to be stable at the time of the inspection. Runoff from this portion of <br />the pile goes into the West Pit pond. No erosional problems were noted of the pile at <br />the time of the inspection. The upper portion of the pile is truck-dumped spoil. This <br />part of the pile appeared to be stable at the time of the inspection. The reclamation <br />plan calls for the top 75 feet of this pile to be hauled to the West Pit to achieve AOC. <br />This is being further addressed in Technical Revision 63. <br />- Streeter fill appeared to be stable at the time of the inspection. No erosional <br />problems were noted on the fill. This pile has gone through a Phase II bond release. <br />The operator has submitted Technical Revision 64 to terminate quarterly inspections <br />for this pile. The Division issued a proposed decision to approve TR-64 on 17 October <br />2006. The Streeter pond below, however, still receives runoff from disturbed areas, so <br />it must remain. <br />-The Section 16 Fill was not accessible at the time of the inspection due to snow. This <br />pile has gone through a Phase II bond release. The operator has submitted Technical <br />Revision 64 to terminate quarterly inspections for this pile. The Division issued a <br />proposed decision to approve TR-64 on 17 October 2006. The Section 16 Pond below <br />the fill still receives disturbed area runoff and will remain. <br />Highwall Miner: -ICG was operating in the E-Seam on the east side of Taylor Draw in <br />the West Pit at the time of the inspection. They appeared to be at about half way up <br />the draw at the time of the inspection. The previous holes outside the operational <br />area have been filled, with approximately five holes remaining open. This is still <br />acceptable based on the approved highwall mining plan in the permit. ICG is <br />mining from the north to the south and they are stockpiling the coal to the north <br />behind the operation. Colowyo will move the coal once ICG has completed their <br />mining operations. ICG has completed the mining activities on the west side of Taylor <br />Draw and all of the highwall miner holes have been filled. <br />Overall, the operations and reclamation at the Colowyo Mine are being conducted <br />in accordance with the approved plans contained within the PAP. The operation is <br />doing a good job ensuring compliance with all of the Rules. <br />