My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC17091
DRMS
>
Back File Migration
>
Inspection
>
INSPEC17091
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:18:55 PM
Creation date
11/18/2007 9:19:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
2/14/2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colowyo C-1981-019 <br />14 February 2007 <br />Pg 4/5 QJ~~ <br />Hydrologic Balance (cont.): - Gulch A Pond (cont.) There is very little storage room <br />and detention time because of this. The Division will check the quarterly DMR's for <br />the discharge to see if any exceedences have occurred at the Gulch A pond as a <br />result. The pond embankment was well vegetated and appeared to be stable at <br />the time of the inspection. No erosional problems noted on the embankment at the <br />time of the inspection. The emergency spillway is an open, trapezoidal riprapped <br />channel. The spillway was stable and well maintained at the time of the inspection. <br />Goodspring Creek was flowing at the time of the inspection. <br />-Sump 1 was filled with sediment due to all of the rain and runoff from the snow melt <br />over the past weekend. The sump needs to be cleaned. The sump appeared to be <br />stable at the time of the inspection. <br />-Sump 2 was filled with sediment due to all of the rain and runoff from the snow melt <br />over the past weekend. The sump needs to be cleaned. The sump appeared to be <br />stable at the time of the inspection. <br />-Sump 3 was filled with sediment due to all of the rain and runoff from the snow melt <br />over the past weekend. The sump needs to be cleaned. The sump appeared to be <br />stable at the time of the inspection. <br />-Sump 4 was filled with sediment due to all of the rain and runoff from the snow melt <br />over the past weekend. The sump needs to be cleaned. The sump appeared to be <br />stable at the time of the inspection. <br />-Sump 5 was covered with snow at the time of the inspection so it was impossible to <br />tell what was under the snow. Based on Sumps 1-4 it is probable that it is filled with <br />sediment as well. If this is the case, Sump 5 needs fo be cleaned as well. The sump <br />appeared to be stable at the time of the inspection. <br />Backfilling and Grading: -The operator has completed more work on the East side of <br />the East Pit with the 101 dragline. The dragline was walking back to the north working <br />on the second cut in the wedge it is working on. The dragline is more than half of the <br />way along on this cut. After this second cut is completed, it appears as though there <br />are two more cuts remaining until the wedge is filled in. <br />-The 102 dragline has completed some reclamation work at the west edge of the <br />West Pit. This reclamation was performed last month. <br />Support Facilities: -The facilities area was wet and muddy but in good condition at <br />the time of the inspection. No problems were noted with the area. <br />-The Gossard Loadout was wet but appeared to be stable and in good condition at <br />the time of the inspection. <br />General Mine Plan Compliance: -The 101 dragline is in the East Pit performing <br />reclamation. The 102 dragline was removing D-seam overburden. The 103 dragline <br />was removing E-Seam overburden. <br />- The 1 14 shovel operation was currently working on removing the A-Seam <br />overburden. <br />-The operator was removing and hauling coal from the X-seam at the time of the <br />inspection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.