Laserfiche WebLink
<br /> <br /> <br />IZI, Problems, Recommendations and Compliance Dates <br />The operator is advised that the following problems have been identified during the inspection <br />and that failure to correct the problems may result in the Division [aki ng an ENFORCEMENT ACTION <br />pursuant to CRS 1973, as amended, 34-33-123. (Recommendations and compliance dates are to be <br />clearly noted. Dates are to be specific, e. g., January 3Z, 1981 and underlined) <br />1. Clean the east upper diversion ditch at a point about 200 feet south of the north <br />end by April 9, 1981. <br />2. Deepen the refuse pile diversion ditch by aril 13, 1981. <br />Problems with the drainage ditches have been recurrent. The operator should set up <br />an inspection schedule to regularly check for maintenance needs. <br />