Laserfiche WebLink
:, <br />_. ~ <br />t <br />A <br />N. The coffer dam has been built on Dac•is Gulch and the site has been <br />grouted in preparation for Davis Gulch Dam. <br />I. Road disturbance, topsoil stockpiles and a stream gauge station exists <br />at the end of the property on Davis Gulch. Lands on both sides of Davis Creek <br />have been extensively disturbed. Davis Creek flows under sections of road <br />through what appear to be undez'size culverts. <br />J. The South Draw topsoil stockpile contains approximately 400,000 cubic <br />yards and the North Draw - Ridgetop topsoil stockpile has approximately 2.3 <br />million cubic yards. <br />K. The Electric Sub-station, PZ ant Site, La Salle Laydown Area and Course <br />Ore Stockpile Area have been extensively distvrbed and are in various stages <br />of completion. The plan site contains @ 3 million cubic yards of fill. <br />L. The hillside, Natural Drainage, and Iti1l-top located between Davis <br />Gulch and Middle Fork have been extensively disturbed due to access toad <br />construction and the Summit construction Camp. <br />JM:ys <br />