Laserfiche WebLink
COMMENTS -COMPLIANCE SrJMI '1 ~re(D C d/~~~ <br />P~~/a ~FPSoa 3~ <br />Below are comments on the inspection. The comments include discussion of observations <br />made during the inspection. Comments also describe any enforcement actions taken during <br />the inspection and the facts or evidence supporting the enforcement action. <br />REVEGETATION/RECLAMATION SUCCESS: There was a dusting of snow on the ground at both <br />the mine site and the loadout. However, the vegetation at the loadout and on the refuse pile <br />appeared to be good. It had been indicated that the Operator would probably seed and <br />mulch the refuse pile this spring. <br />Miscellaneous: The operator is continuing the reclamation of the mine site. In addition to the <br />work at the refuse pile, the following list is items that have been started and/or completed <br />since the last inspection. <br />- The office/shop/warehouse building demolition has begun. <br />- Demolition debris is being placed in pond 1. <br />- The coal storage bin (by the truck loadout) has been cut from its supports. <br />- More of the equipment in the facilities area has been removed. <br />