Laserfiche WebLink
<br />INSPECTION REPORT - PAGE 2 <br />FILE N0. 80-120 <br />DATE: January 25, 1984 <br /> <br />OBSERVATIONS OF IMPORTANCE: <br />1. Operation remains to initial stages. <br />2. Approximately five acres of pond have been excavated. <br />3. Operation is progressing to the west. <br />4. Topsoil stripping and salvage 15 occuring. <br />5. Deposit material has been stockpiled immediately west of pond. <br />6. Removal of topsoil and aggregate 15 active and ongoing at time of <br />inspection. <br />7. Pond banks exceed 2:1 slopes, 3:1 five feet above to ten feet below water <br />level. <br />RECOMMENDATIONS: <br />1. Reduce and maintain slopes to 3:1 five feet above to ten feet below water <br />line per Rule 6.1(f). <br />2. Verse all people at site with mine and reclamation permit plan and maps. <br />BJ/ph <br />Doc. No. 9192 <br />