Laserfiche WebLink
IV. ENFORCEMENT ACTIONS <br />The following identifies enforcemen} actions taken during this inspection, the required abatement, and date of abatement for the <br />violation, previous violations still requiring abatement, and the termination of violations cited during previous inspections. <br />NOTE: Attach appropriate VIOLATIONS or CESSATION ORDER CODING FORMS <br />Violation CV-2004-001 was issued on June 22, 2004, and is the only violation not completely abated at the <br />time of previous inspections. The only portion of this violation that still requires abatement is Abatement Item <br />3b. The due-date for this action was extended from September 21, 2004 to December 20, 2004, to Mazch 20, <br />2005, to June 18, 2005, and again to September 16, 2005. Item 3b is to submit to the Division of Minerals and <br />Geology an application for a Technical Revision (or Permit Revision as may be necessary) to the Colowyo Coal <br />Company Permit Application Package to include BLM approval of a coal lease modification, and obtain any <br />required OSM mine plan modification approvals. <br />No enforcement action was taken as a result of this inspection. <br />Page _ 7 _ of _ 7 _ Pages, Date _27 June 2005 ,Initials <br />