Laserfiche WebLink
(Page 41 <br />MINE ID # OR PROSPECTING ID # M-7978-277 <br />INSPECTION DATE 8/28/02 <br />INSPECTOR'S INITIALS RCO <br />The following problems 1P6) and/or possible violations (PV) land suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMSIPOSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />1. The onsite activities are either encroaching on the boundaries or inadequately mapped, and the <br />Division does not have a reliable record of these items or features. <br />Corrective action: The pnerator must provide a statement explaining where the permit boundary i <br />in relation to onsite activities. as described in the narrative. If such dP.SCrID110n is insufficient. DM <br />will require the map to be updated. The date this is to be received by DMG is the permit <br />anniversary date, as shown to the right. The submittal of this corrective action may be made as <br />Aart of the annual report. <br />2. Topsoil is still not being adequately salvaged, stored, or replaced in a timely manner. <br />Corrective action: The operator must provide a statement. as described in the narrative. showin <br />.ommitm .nt to f rture toncoil salvag . ad a gat _ cro .k ip linp. protection aq~3inst wePdc and ernaon <br />and its timely replacement as part of final reclamation where possible. Accompanying this, the <br />operator must provide an annual reporting of topsoil handling and protection activity during the <br />report year. The statement and report must be submitted with the next annual report. on the <br />anniversary date as shown to the right. <br />3. (No additional problems.) <br />CORRECTION <br />DATE <br />t d 3d 02 <br />PB or PV: ~'~ <br />TOPIC(SI: ~g <br />t d 30 / 02 <br />PB or PV: ~~ <br />TOPIC(Si: _SS_ <br />End of report. <br />