Laserfiche WebLink
oQ ~o COLORADO DIVISION OF MINERALS AND GEOLOGY <br />~Q - ~8 MINERALS PROGRAM INSPECTION REPORT <br />.e r PHONE: (303) 866-3567 <br />Y te96 ~ <br />The Division of Minerals and Geology has conducted an inspection of the mining operation noted below. This report <br />documents observations concerning compliance of the mining operation with the permit and the regulations of the <br />Mined Land Reclamation Board. The report notes 1) Areas of successful compliance; 2) Problems and suggested <br />corrective actions and/or 3) Possible violations to be considered for possible enforcement action by the Mined Land <br />Reclamation Board. OPERATORS SHOULD READ THIS REPORT CAREFULLY BECAUSE IT MAY REQUIRE <br />CORRECTIVE ACTION AND/OR RESPONSES TO THE DIVISION IN ORDER TO AVOID CONSIDERATION <br />MINE NAME: PUEBLO WEST ' <br />COUNTY: PUEBLO MINE <br />INSPECTOR(S): BERHAN I{EFFELEW OPERATOR: TRANSIT MIX OF PUEBLO <br />Q TYPEOFOPERATION: 112C <br />'Y J <br /> <br />MINE ID # OR PROSPECTING ID #: M-1977-_573 d <br />~ <br />INSPECTION DATE: ATE OF COMPLAINT: NO <br />INSPECTOR'S INITIALS: _~ TIME OF DAY (MILITARY): 9:40 <br />INSPECTION TYPE CODE°I: MI POST INSP. CONTACTStzI: NO <br />JOINT INSP. AGENCY CODE1~1: NO REASON FOR INSP. CODEt~i: IE <br />WEATHER CODEt°I: CL BOND CALCULATION TYPEtst: RC <br />OP. REP. PRESENT: BILL POPE <br />1. INSPECTION TYPE CODE -ICL-IN: IL=Illegal Operation, MI=Monitoring, MP=Mineral Prospect, S1=Surety-related, PR=Preopera[ionl <br />2. POST INSPECTION CONTACTS AND JOINT INSPECTION AGENCY CODE-ICL-AG; NO=None,BL=BLM,CH=Colo. Dept Health; CL=Land Board, <br />CT=Citizen; CW~Wildlite, FS=Farest Service, HW=Hwy. Dept., LC=Local Government, SE=State F.ngr.I <br />3. REASON FORINSPECTION CODE-[CL-RS:AC=Other Agency Request,CT=Citizen Complaint,lE=Norman&E Program, HP=High Prlority,PY=Prlarityl <br />4. WEATHER CODE -ICL-WE: CL=Cloudy, CR~Cleaq IN=Inclement -prevented inspeMion, RN=Raining, SN=Snowing, WD=Windyl <br />5. BOND CALCULATION TYPE: - iBC~Complete Bond, BP=Partial Bond, NN=None) <br />This list identifies the environmental and permit parameters inspected and gives a categorical evaluation of each. IF PB <br />OR PV IS INDICATED. YOU SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE <br />COMPLIANCE WITH THE TERMS OF YOUR PERMIT AND APPLICABLE RULES AND REGULATIONS. If PV <br />is indicated, you will be notified under separate cover when the Mined Land reclamation Board will consider possible <br />enforcement action. <br />GENERAL INSPECTION TOPICS <br />(AR) RECORDS .................................... ~ (FN) FINANCIAL WARRANTY...... ~ (RD) ROADS...................L- <br />(HB) HYDROLOGIC BALANCE ............... (BG) BACEFILL & GRADING....... ~ (EX) EXPLOSIVES...........IYA_ <br />(PW) PROCESSING WASTE/TAILING...... ]YA (SF) PROCESSING FACILITIES..... 1~IA (TS) TOPSOIL .................] <br />(MP) GENL MINE Pi,~av COMPLIANCE... ~- (FW) FISH & WILDLIFE ...............} (RV) REVEGETATION.....ly~ <br />(SM) SIGNS AND MARKERS .................. Y (SP) STORM WATER MGT PLAN... ~i (SB) COMPLETE INSP..... Y <br />(ES) OVERBURDEN/DEV. WASTE........... NA (SC) EROSION/SEDIMENTATION.. Y (RS) RECL PLAN/COMP...Y <br />(AT) ACID OR TOXIC MATERIALS......... ~ (OD) OFF-SITE DAMAGE .............. Y (ST) STIPULATIONS........Y <br />Y=Inspected and Fouud to Compliance PV =Inspected end Possible Violations Noted PB =Inspected and Problems Noted <br />N =Not Inspected NA =Not Applicable <br />