Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. <br />these reports were supplied to Mr. Peterson. The first quarter 2007 sediment pond inspection report <br />had not been filed in the files at the time of the inspection. The operator needs to file these reports as <br />soon as possible. It was noted that the 2006 Annual Hydrology Report was dated March 2006. DRMS <br />believes that this report was completed in March 2007. Mr. Peterson was noticed of this discrepancy, <br />and made appropriate date corrections. <br />Reve etag lion: Vegetation throughout the mine site appeazed very good. Shrub establishment in the <br />southern portions of the mine site (reclaimed 720 pit) is very good. Good vegetative diversity was <br />observed o the reclaimed mine and loadout areas. Older reclamation on the Marr pit azea that pre-dates <br />1981, were less diverse but appeared to have good vegetative cover established. Domestic livestock <br />grazing had not occurred on the mine site south of county road 12E yet this year. Cattle were observed <br />grazing in the reclaimed Pond G area and had been on the northern portion of Pit 1. <br />4 of 5 WHITE -File YELLOW -Operator PINK -Specialist <br />