<br />Bowie No. 2 Mine: aQ. 2 <br />The sediment pond and topsoil stockpile at the mine entrance were stable and the pond was not <br />discharging. We continued to the gob pile and adjacent cover pile stockpile. Both piles and <br />water control ditches appeared stable. The uphill end of the underdrain for the gob pile is <br />evident. Some small piles of gob and sediment from pond clean out will be graded /compacted <br />when completely dry. The sediment ponds for this area were stable and not discharging. The gob <br />pile sediment pond was cleaned out last fall. The water pumping station area was stable and we <br />thought we identified some whitetop in this area which should be sprayed. <br />We continued by driving to the vent shaft construction site. The construction is nearing <br />compietion and the site had silt fence protection. We returned to the facility area and walked to <br />the upper pad which holds the ventilation fan /electrical substation. This area is neat and orderly <br />and Mr. Dudash identified some minor ditch maintenance here. We walked the main facility <br />area and coal stockpiles. These areas were also neat and well maintained. Mr. Dudash discussed <br />means to ensure a culvert location would be kept clear at the east side of the coal stockpile. All <br />fuel and lubricant storage was well organized and maintained. This concluded the field <br />inspection. <br />Mr. Dudash conducted a thorough review of permitting and environmental monitoring records at <br />the mine of£ce to conclude the inspection. The review included: the current NPDES permit and <br />monthly DMR's, 1~' quarter 2000 refuse pile and sediment pond inspections, haul road and <br />sediment pond certifications, liability insurance and bonding documents need to be updated in <br />the mine site records with current copies, 1999 Annual Reclamation Report (79.0 disturbed <br />acres ), 1998 Annual Hydrology and Subsidence Report (visual subsidence monitoring only) / <br />DMG has granted a time extension for the 1999 Annual Hydrology and Subsidence Report, and <br />the CPDES Stormwater Management Plan is current. This concluded the inspection. <br />We did not identify any off site impacts during the inspection, and as indicated above, Messrs. <br />Dudash and Bear agreed to several minor maintenance items we identified during the inspection. <br />Overall the mine site is well organized and well maintained, particularly the primary haul road. <br />Proposed construction of the conveyor belt as indicated above will probably eliminate the need <br />for haul trucks to access the main facility bench coal stockpiles, and will be a major safety <br />improvement for the entire operation. <br />Please address any questions concerning this report to Henry Austin at haustin c(e,osmre.gov or <br />phone to (303) 844-1400 X1466. <br />