Laserfiche WebLink
(Page 3) <br />MINE ID # OR PROSPECTING ID # M-1997-027 <br />INSPECTION DATE 1-29-2003 <br />INSPECTOR'S INITIALS SSS <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. T~~ ^tonkpjlPC dill do not c~pf,nrt anv ~jZjpgyeggtation <br />03 / 31 / 2003 <br />PB or PV: PB <br />CORRECTIVE ACTION: TOPIC(S): TS <br />If reclamation including replacement of topsoil is not completed by March 31 2003 The operator <br />must submit documentation that these piles have had the surface loosened (tilledl that thev have <br />been seeded and mulched by that date <br />2 <br />e ~~ r ~ ' rh p~undarv 03 / 14 / 2003 <br />.y,a" - - <br />PB or PV: PB <br />CORRECTIVE ACTION: TOPIC(S): MP <br />These features must either be removed from the site or an amendment to the permit must be filed BQ B$ - <br />addressing incorporating thse features into the permitarea and soeci ing a post-mining land use that <br />will allow these features to remain on site. <br />3. <br />PB or PV: <br />CORRECTIVE ACTION: TOPIC(S): <br />I, Steve Shuey, hereby certify that on February 11, 2003, I deposited a true and complete copy of this foregoing <br />inspection report in the United States Mail, first class postage paid, to the operator of record for this site at the address <br />indicated, and to those others within the body of this report who have been designated to receive copies (DMG <br />personnel excepted). <br />