Laserfiche WebLink
<br />Riverside Reservoir and Land Company <br />Riverside irrigation District <br />Farmers State Bank of Brush <br />Case No. 90-CW-189 <br />Page 18 <br />Gravel Pit No. 4a <br />Riverside Canal <br />Antelope Draw <br />39. BDP calculations: <br />288 <br />3,630 <br />2,430 <br />SDF calculations involve the solution of the Complementary <br />Error Function, and hence are not amenable to hand calculations. <br />Several computer programs have been developed to process SDF <br />calculations, and the use of such a program is recommended for <br />the administration of this project. The program selected for use <br />in the administration of this project shall be one approved by <br />the Division Engineer. <br />40. Data collection requirements: <br />In order to correctly quantify the net effect to the stream <br />resulting from the operation of this plan for augmentation, the <br />following data shall be collected on a periodic basis: <br />A. Daily flows at the Bruce Weir. <br />per week. <br />B. Staff gage readings at each recharge site, once <br />C. Well meter readings, once per month. <br />D. Weight of mined product removed from property, on <br />November 1 of each year. <br />E. Gravel pit exposed surface areas, initial measure- <br />ment shall be made and reported within 30 days of entry of this <br />Decree, thereafter monthly measurements shall be reported and may <br />be confirmed by the Division Engineer; provided, however, that <br />less frequent measurements may be made with the permission of the <br />Division Engineer. <br />F. Meter readings of the amounts pumped for gravel <br />washing and dust suppression activities associated with the <br />gravel pits, once monthly. <br />41. Depletion schedule: <br />Each year, prior to the irrigation season, the Bank and <br />Riverside must submit a proposed net depletion schedule to the <br />