Laserfiche WebLink
~. _ ~ • • <br />ENERGY FUELS CO RP/ENERGY Ir'1 MINE <br />• CONCLUSIONS <br />The minor modification plan is not specific on many points, and inspection of <br />permit conditions is difficult if not impossible. OSM, USGS, USFWS, CDOW, <br />and MLRB have all obviously had contact with EFC, and several verbal agree- <br />ments on what should be done have apparently been reached. I was not a party <br />[o those conversations and was unaware of those understandings. Tlie result was <br />an incomplete inspection of a nonspecific minor modification mine plan. If the <br />same type of situation is presented again, OSPf should take one of two courses <br />of action: (1) forego issuing a minor modification and wai[ until the major <br />modification is approved and issued or, (2) require that the minor modification <br />be much more specific and complete. <br />l~ <br />DENNIS WINTERRINGER <br />RECLAMATION SPECIALIST <br />-_ J <br />• -3- <br />