My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC15198
DRMS
>
Back File Migration
>
Inspection
>
INSPEC15198
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:16:38 PM
Creation date
11/18/2007 9:09:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Inspection
Doc Name
INSPECTION REPORT
Inspection Date
2/23/1999
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fie access road drainage ditch leading #o Pond 5 needs maintenance work in a few <br />locations. Water has cut around some of the steel "drop structures" in the ditch. <br />There are also same locations where sediment h beginning to accumulate and side <br />slopes are soughing into the dffch, whkh should be maintained. ff appeared that <br />water flowing flxough the 30" CMP into Pond 5 was seeping around the culvert. This <br />flour needs to be reestabOshed inside the culvert. <br />The diversbn around the refuse disposal area has been compromised by relocation <br />of the ramp onto the pile that the haul trucla are using. The dffch to this area needs <br />to be reestablished and maintained at all times. <br />A spring was observed in the Magpie Leek dNerslon just upsheam from fhe ouflet of <br />The Pond 1 discharge pipe. There was a skriv flow (less than 1 gpm) coming from the <br />ground on the GEC side of the drainage. AI Weaver said the spring appeared about <br />three years ago and thought it was coming from ilia Red Lantern coal seam in some <br />underground wortdngs on That side of the drainage. <br />Refuse was being hauled to the acflve end of the refuse pile where n was being <br />spread and compacted by o front end loader. EFCI is preparing to seed the portion <br />of the pile whkh was recently covered with topsoil. <br />The reckshned loadout was recently disked up in preparaflon for reseeding. The <br />operator felt that the initial seeding was not successful. They plan to reseed the area <br />prix to spring snow stoma and snowrr~elt. The area was dry at the time of the <br />inspecflon. <br />
The URL can be used to link to this page
Your browser does not support the video tag.