My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC14652
DRMS
>
Back File Migration
>
Inspection
>
INSPEC14652
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:16:06 PM
Creation date
11/18/2007 9:07:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983033
IBM Index Class Name
Inspection
Doc Date
7/2/2007
Doc Name
Inspection Report
From
DRMS
To
Alvert Frei & Sons, Inc.
Inspection Date
6/15/2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 4) <br />MINE ID # OR PROSPECTING ID #: rn-i aR~-n~~ <br />INSPECTION DATE: nFi~ S/n7 INSPECTOR=S INITIALS: ~AS- <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />where is evidence of unstable soils/slopes for a ramp area approximately 20'x10' between Stage Y 07 / 31 /07 <br />area and Clear Creek. There is also adjacent gully erosion developing in unprotected slope areas <br />near the ramp. <br />PB <br />TOPIC(S): ~IB_ <br />Corrective action: Submit aslope/embankment stabilization plan, in the form of a technical revision, SC _ _ <br />no later than July 31, 2007 for the ramp and unprotected adjacent areas. The stabilization plan will <br />need to include volumes of material needed and itemized cost for installation as well as a time <br />schedule for when the stabilization measures will be completed. <br />2. <br />/ / <br />PB or PV: <br />TOPIC(S): <br />Corrective Actions: - - <br />
The URL can be used to link to this page
Your browser does not support the video tag.