Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. <br />Two Notices of Violation (NOV s) were issued as a result ofthis inspection. Required abatement measures <br />and dates are as follows: <br />NOV CV-2002-018 <br />1. By September 2Q, 2002, implement interim measures to safely direct all drainage from portal <br />bench/pazking area (including portal area seepage) into Sediment Pond 8. <br />2. By September 30, 2002, submit a complete technical revision application addressing appropriate <br />measures to modify, repair, or abandon and replace the existing buried PVC pipe drain system. <br />Design details including sizing, location, gradient and materials of all components of the proposed <br />system will need to be specified. <br />3. Implement and complete installation as specified in the technical revision plan, within 20 days of <br />final approval. <br />NOV CV-2002-019 <br />1. By September 27, 2002, submit a technical revision application addressing: <br />a) Repair of borrow area gully, elimination of temporary road segment, and diversion of light use road <br />drainage away from the gully location into natural drainage. <br />b) Final reclamation map for RSRDA Borrow Area, and design for a stable drainage way into and across <br />the reclaimed RSRDA Borrow Area. <br />c) Plan for repairing eroded segment of backfilled Haul Road 2, and design for safely extending Haul <br />Road 5 drainage relief ditch to Coal Creek, without causing erosioin of reclaimed Haul Road 2 or <br />adjacent areas. <br />2. Implement and complete plans specified in technical revision within 20 days of final approval. <br />There are no outstanding abatement items from previous inspections. <br />