My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC14389
DRMS
>
Back File Migration
>
Inspection
>
INSPEC14389
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:15:51 PM
Creation date
11/18/2007 9:05:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998080
IBM Index Class Name
Inspection
Doc Date
9/27/2002
Doc Name
inspection report
From
dmg
To
H & H Stone
Inspection Date
9/5/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 31 <br />MINE ID 11 OR PROSPECTING ID J/ M-1998-080 <br />INSPECTION DATE 9/5/02 INSPECTOR'S INITIALS WHE <br />Notice to Increase the Financaa! Warranty . <br />Pursuant to Rule 4.2.1, and based upon the above described conditions, DMG has reviewed the <br />current cost of reclamation, totaling 59,972. Therefore, the existing 56,347 financial warranty <br />appears insufficient to ensure reclamation. Please find enclosed, copy of DMG's reclammation cost <br />estimation, dated September 27, 2002, totaling 59,972. Please note that portions of the increased <br />cost of reclamation result-from the operator exceeding the 3 acre affected area limitation, approved <br />in the original application. Even though the operator may have exceeded the original 3 acre <br />limitation, mining and reclamation activities appeared well within the approved permit boundary. <br />Therefore, the acreage exceedence does not appear,to.be a violation of permit conditions or of the <br />Act and Rules. However, the amount of financial warranty must be adjusted accordingly to <br />accurately reflect the current cost of reclamation. <br />Pursuant to Rule 4.2.112, the operator has 60 days from the signature date of this inspection <br />report, to post 53,625 additional financial warranty to ensure a total financial warranty not less <br />than 59,972. Alternately, the operator may elect to conduct reclamation on portions of the <br />affected land to reduce the current cost of 'reclamation and thereby ensure the sufficiency of the <br />existing financial warranty. Should the operator elect to conduct reclamation for portions of the <br />permit area, the same deadline applies. <br />If the operator disagrees with this Notice to Ihcrease the Financial Warranty, DMG will schedule <br />the matter for a hearing before the Board.. Should the operator fail to ensure the sufficiency of the <br />financial warranty by the statutory deadline, DMG may schedule the matter for Formal Board <br />Hearing for possible violation for failure to maintaih the financial warranty. Such violation may <br />result in permit revocation. <br />Responses to this inspection report should be directed to the Division of Minerals and Geology, 701 <br />Camino del Rio, Room 125, Durango, Colorado 81301,'Attn: Wally Erickson, phone no. 970-247- <br />5469. <br />I & E Contact Address <br />NAME <br />OPERATOR <br />STREET <br />CITY/STATE2IP <br /> cc: Tom Gillis, DMG <br /> ^ CE <br />Fred Hollev X BLM, Loren Wickstrom <br />H & H Stone ^ FS <br />P.O. Box 162 ^ HW <br />Dove Creek, CO 81324 ^ HMWMD (CH) <br /> ^ SE <br /> ^ WOCD (CH) <br /> ^ OTHER <br />
The URL can be used to link to this page
Your browser does not support the video tag.