Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. the comments include discussion of observations <br />made during the inspection. Comments also describe any enforcement actions taken during <br />the inspection and the facts or evidence supporting the enforcement action. <br />There aze a few maintenance items that need to be taken care of that aze associated with <br />the train loadout project. There is a section of disturbed azea on the south side of the <br />disturbed area that is generally to the south of the new Barnes house that could use some <br />silt fence. An upland diversion berm will, ultimately, need to be constructed on the <br />upgradient side of the main topsoil stockpile. On the extreme east end of the project azea, <br />upland diversion ditch D-Hl needs to be extended more to the east. At the western most <br />disturbance, the silt fence needs to be extended more to the west. Also, the straw bales at <br />the down gradient end of the conveyor comdor and material storage need to be placed <br />better. At the main topsoil stockpile, the berm around the temporazy fuel facility tank <br />needs to be much higher. <br />c:fms971bowie2/insp0602 <br />