My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC14113
DRMS
>
Back File Migration
>
Inspection
>
INSPEC14113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:15:35 PM
Creation date
11/18/2007 9:03:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977062
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DMG
To
Benson Brothers
Inspection Date
11/20/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />L --- ---- ---------- ------_ _- -- --- ___.~ _.- <br />PROJECT IDENTIFICATION <br />Task # : 01a State :Colorado <br />Date : 12/19/2002 County :Delta <br />User : SSS Site :Hallenbeck Pit <br />Agency or organization name : DMG <br />Permit or other job action :Routine Reclamation Cost Estimate <br />Task description :Reduce Highwall to 5:1 slope <br />L <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank upper <br />Horsepower: 405 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosNhour : $54.31 NA <br />Operating cosUhour : $95.93 100 <br />Ripper op. cost/hour : $0.94 10 <br />Operator cosUhour : $27.99 NA <br />Total unit cost hour : $179.16 Total fleet cosUhour : , $179,16 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 33,333 LCY factor : NA volume : 33,333 LCY <br />Source of estimated volume :400'L x 30'H hiy <br />_ __Source of estim_atetl swell factor : NA <br />HOURLY PRODUCTION Jc <br />Average push distance : 75 feet <br />Unadjusted hourly production : 1,514.3 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 10.00 % (~ <br />Average site altitude : 5,300 feet <br />Material weight : 2,500 Ibs/LCY <br />Weight description <br />iition Correction Factors Source J <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Btadetype <br />Net correction <br />Clay -Dry Adjusted unit production <br />Adjusted fleet production <br />JOS 71ME AND COST <br />Fleet size : 1 Dozers) Total job time <br />Unit cost : $0.142 /LCY Total job cost <br />f <br />backfilled to 5:1 from <br />Permitlob# : M-1977-062 <br />Abbreviation :none <br />Filename :M062-01a <br />0.75 <br />1.10 <br />1.20 <br />1.00 <br />0.83 <br />0.90 <br />1.22 <br />1.00 <br />0.92 <br />1.00 <br />0.83 <br />1262.09 LCY/hr <br />1,262.09 LCY/hr <br />26.41 Hours <br />$4, 732 <br />- - -~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.